Planning application details ref: 0910860 Mayo County Council

100%100% Complete (warning)

Planning Application: 0910860 (Mayo County Council )
File Number: 0910860
Application Type: EXTENSION OF DURATION Planning Status: APPLICATION FINALISED
Received Date: 19/10/2016 Decision Due Date: 13/12/2016
Validated Date: 19/10/2016 Invalidated Date:
Further Info Requested: Further Info Received:
Withdrawn Date: Extend Date:
Decision Type: Decision Date: 09/12/2016
Leave to Appeal: Appeal Date:
Commenced Date: Submissions By: 22/11/2016

Applicant Details

Applicant name: CONSTANT ENERGY LIMITED
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: EXTENSION OF DURATION OF P09/1086 - THE DEVELOPMENT WILL CONSIST OF A 200 MEGAWATT NATURAL GAS FIRED PEAKING POWER PLANT COMPRISING OF THE ELECTRICITY GENERATING STATION, AN ABOVE GROUND NATURAL GAS INSTALLATION AND ELECTRICAL SWITCHYARD, ACCESS ROAD AND ASSOCIATED INFRASTRUCTURE. THE ELECTRICITY GENERATING STATION WILL COMPRISE OF TWO GAS TURBINE GENERATORS EACH CONSISTING OF AN AIR INTAKE FILTER SYSTEM, EXHAUST STACK, AIR VENT STACK, INTER-COOLER SYSTEM, TURBINE CONTROL ROOM AND TRANSFORMERS. THE STATION WILL ALSO COMPRISE OF AN ADMINISTRATION BUILDING, A WATER TREATMENT PLANT, A FIRE FIGHTING PUMPHOUSE, A FIRE/RAW WATER STORAGE TANK, CHEMICAL STORAGE TANKS, DEMINERALISED WATER STORAGE TANK, A BACKUP DIESEL FUEL STORAGE TANK, A FUEL SUPPLY PUMPHOUSE, AIR COOLERS, AIR COOLER CONTROL MODULE, AN EFFLUENT TREATMENT PLANT AS WELL AS ALL ASSOCIATED INTERNAL AND EXTERNAL EQUIPMENT ABOVE AND BELOW GROUND INFRASTRUCTURE, ROADS AND CAR PARKS. THE AGI WILL COMPRISE OF ABOVE GROUND GAS PIPES AND EQUIPMENT, HEATING AND PRESSURE REGULATING BUILDINGS AND ALL ASSOCIATED ROADS AND ABOVE AND BELOW GROUND INFRASTRUCTURE. THE 110KV ELECTRICAL SWITCHYARD WILL COMPRISE OF ABOVE GROUND ELECTRICAL EQUIPMENT BUSBAR, A CONTROL BUILDING AND ALL ASSOCIATED ROADS AND ABOVE AND BELOW GROUND INFRASTRUCTURE. PERMISSION IS ALSO SOUGHT FOR ALL ANCILLARY SITE DEVELOPMENTS INCLUDING LANDSCAPE, BOUNDARY, FIREFIGHTING, AND DRAINAGE WORKS.
Development Address: CROAGHAUN WEST, BELLACORICK, CO. MAYO
Architect Name: Location Key: CROAGHAUN
Electoral Division: Planner: Brendan Munnelly
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 09/12/2016 Manager Order: P1426/2016
Decision Type: Number of Conditions: 0
Grant Date: Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date: 15/11/2021
Decision Description: EXTENSION OF DURATION OF P09/1086 - THE DEVELOPMENT WILL CONSIST OF A 200 MEGAWATT NATURAL GAS FIRED PEAKING POWER PLANT COMPRISING OF THE ELECTRICITY GENERATING STATION, AN ABOVE GROUND NATURAL GAS INSTALLATION AND ELECTRICAL SWITCHYARD, ACCESS ROAD AND ASSOCIATED INFRASTRUCTURE. THE ELECTRICITY GENERATING STATION WILL COMPRISE OF TWO GAS TURBINE GENERATORS EACH CONSISTING OF AN AIR INTAKE FILTER SYSTEM, EXHAUST STACK, AIR VENT STACK, INTER-COOLER SYSTEM, TURBINE CONTROL ROOM AND TRANSFORMERS. THE STATION WILL ALSO COMPRISE OF AN ADMINISTRATION BUILDING, A WATER TREATMENT PLANT, A FIRE FIGHTING PUMPHOUSE, A FIRE/RAW WATER STORAGE TANK, CHEMICAL STORAGE TANKS, DEMINERALISED WATER STORAGE TANK, A BACKUP DIESEL FUEL STORAGE TANK, A FUEL SUPPLY PUMPHOUSE, AIR COOLERS, AIR COOLER CONTROL MODULE, AN EFFLUENT TREATMENT PLANT AS WELL AS ALL ASSOCIATED INTERNAL AND EXTERNAL EQUIPMENT ABOVE AND BELOW GROUND INFRASTRUCTURE, ROADS AND CAR PARKS. THE AGI WILL COMPRISE OF ABOVE GROUND GAS PIPES AND EQUIPMENT, HEATING AND PRESSURE REGULATING BUILDINGS AND ALL ASSOCIATED ROADS AND ABOVE AND BELOW GROUND INFRASTRUCTURE. THE 110KV ELECTRICAL SWITCHYARD WILL COMPRISE OF ABOVE GROUND ELECTRICAL EQUIPMENT BUSBAR, A CONTROL BUILDING AND ALL ASSOCIATED ROADS AND ABOVE AND BELOW GROUND INFRASTRUCTURE. PERMISSION IS ALSO SOUGHT FOR ALL ANCILLARY SITE DEVELOPMENTS INCLUDING LANDSCAPE, BOUNDARY, FIREFIGHTING, AND DRAINAGE WORKS.

Appeal Details


Appeal Details
Notification Date: BP Reference #:
Appeal Type: File Forward Date:
Submission Due Date: Submission Sent Date:
Appeal Decision: Decision Date:
Withdrawn Date: Dismissed Date:
Reason: