1. Permission for a warehouse unit with a cumulative gross floor area of 6806.3sq.m of which the warehouse area comprises 4674.4sq.m at ground floor along with a mezzanine floor area comprising 351.8sq.m, the provision of a ground floor office and staff areas comprising 760.4sq.m along with a first floor office comprising 484.2sq.m and a second floor plant storage area comprising 525.4sq.m. The warehouse building will have an overall height of 14.65 metres.
2. Vehicular access will utilise the existing City North Campus Estate roads.
3. The development of associated internal access roads, turning/loading areas, footways, parking areas, electric vehicle charge points and associated ducting, landscaping, lighting, fencing, bicycle and bin storage facilities and associated site works.
4. The provision of façade signage along with provision of a totem sign.
5.The provision of an ESB substation.
6. Provision of attenuation tanks and associated infrastructure as part of the surface water system along with installation of a bypass hydrocarbon interceptor.
7. All ancillary site development, landscaping and construction works to facilitate foul, water and service network connections.
An Environmental Impact Assessment Report (EIAR) has been prepared in respect of the proposed development and accompanies this application.
Development Address:
Lands at City North Business Campus, Stamullen, Co Meath
Architect Name:
Location Key:
STAMULLEN
Electoral Division:
Incorrect Icl Voter Recor
Planner:
Matt Tully
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
29/04/2025
Manager Order:
734/25
Decision Type:
Conditional
Number of Conditions:
15
Grant Date:
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
Decision Description:
1. Permission for a warehouse unit with a cumulative gross floor area of 6806.3sq.m of which the warehouse area comprises 4674.4sq.m at ground floor along with a mezzanine floor area comprising 351.8sq.m, the provision of a ground floor office and staff areas comprising 760.4sq.m along with a first floor office comprising 484.2sq.m and a second floor plant storage area comprising 525.4sq.m. The warehouse building will have an overall height of 14.65 metres.
2. Vehicular access will utilise the existing City North Campus Estate roads.
3. The development of associated internal access roads, turning/loading areas, footways, parking areas, electric vehicle charge points and associated ducting, landscaping, lighting, fencing, bicycle and bin storage facilities and associated site works.
4. The provision of façade signage along with provision of a totem sign.
5.The provision of an ESB substation.
6. Provision of attenuation tanks and associated infrastructure as part of the surface water system along with installation of a bypass hydrocarbon interceptor.
7. All ancillary site development, landscaping and construction works to facilitate foul, water and service network connections.
An Environmental Impact Assessment Report (EIAR) has been prepared in respect of the proposed development and accompanies this application.
The development will consist of: the construction of a warehouse building with a gross floor area (GFA) of 7,511 sq.m, including a warehouse area of 6,766 sq.m and 2-storey office element of 745 sq.m, with a maximum height of 15.2m. Vehicular access to the site will utilise the existing City North Business Campus estate roads and includes works to extend the existing carriageway by approx. 7m to facilitate access to the development site. A total of 98 car parking spaces and 98 secure bicycle parking spaces will be provided. A temporary wastewater treatment plant is to be provided for the treatment of foul effluent before discharge to the existing network. 1 ESB substation is proposed (c.28 sq.m and 3.5m in height). The proposal also includes drainage, landscaping and external lighting and all associated site works to facilitate the proposed development. An Environmental Impact Assessment Report (EIAR) has been prepared in respect of the proposed development. Significant further information/revised plans submitted on this application
the development will consist of amendments to An Bord Pleanala permission reference 312771-22 to consist of the following:
1. Removal of condition 3 which states ‘The buildings hereby permitted, and all activities occurring therein, shall only operate between 0700 hours and 2100 hours, Monday to Friday and between 0700 and 1430 hours on Saturdays. No activity shall take place outside these hours or on Sundays or public holidays.’
2. Amendments to the site boundary.
3. Amendments to the design and layout of units 10, 12 and 13.
4. Provision of an acoustic berm and associated landscaping works.
5. Amendments to the site layout.
6. Omission of the temporary wastewater treatment plant with connections made to the public mains for wastewater services.
7. Associated site works to include for revised parking, loading and turning areas along with drainage, landscaping, external lighting.’
Construction of 3 warehousing units. The 3 warehousing units will have gross floor areas of 1864.91m2, 1435.50m2, & 4424.32m2 respectively. Each warehouse unit includes a mezzanine floor, reception area, w.c. facilities and office areas. The proposed development also consists of construction of access road to join road carriageway previously permitted under Reg. Ref. SA/60232.
Unit 4,5 & 6, Block 3, City North Business Park Gormanston Stamullen
change of use of these three units, total floor area 1185 square metres, from their approved use as warehouses to use jointly as a medical clinic and to carry out limited alterations to the external elevations of these units