the development will consist of land reclamation works over an area of approximately 3.16ha comprising of the importation of inert soil (approximately 96,700 tonnes) and the redistribution of approximately 1,300 tonnes of soil from part (0.35ha) of the adjoining previously permitted reclamation area (MCC Ref. DA/20014 ABP Ref. PL.17.29591) to reduce the finished ground level in that part of the reclaimed area by approximately 0.2 m. The increase in ground level on the proposed reclamation area is approximately 1.8m. The proposed development also includes for the repair & reinstatement of exisitng internal haul road; creation of a hard standing area of approximately 135sqm surrounded by a 0.45m wall; reinstatement of an existing (currently used) wheel wash and relocation of existing container on site and temporary use as site office (an Appropriate Assessment Report submitted)
development which will consist of carrying out a land recovery operation (a waste permit has been granted for this activity WMP 2003/36 refers)wherein inert soil and top soil complying with class 10 of the 4th Schedule of the Waste Management Act shall be imported and spread on site with a consequential benefit for agricultural activity on the lands
No Environment Impact Assesments Associated with this Application