the development will consist of land reclamation works over an area of approximately 3.16ha comprising of the importation of inert soil (approximately 96,700 tonnes) and the redistribution of approximately 1,300 tonnes of soil from part (0.35ha) of the adjoining previously permitted reclamation area (MCC Ref. DA/20014 ABP Ref. PL.17.29591) to reduce the finished ground level in that part of the reclaimed area by approximately 0.2 m. The increase in ground level on the proposed reclamation area is approximately 1.8m. The proposed development also includes for the repair & reinstatement of exisitng internal haul road; creation of a hard standing area of approximately 135sqm surrounded by a 0.45m wall; reinstatement of an existing (currently used) wheel wash and relocation of existing container on site and temporary use as site office (an Appropriate Assessment Report submitted)
land reclamation works over an area of approximately 3.16ha comprising of the importation of inert soil (approximately 96,700 tonnes); and the redistribution of approximately 1,300 tonnes of soil from part (0.35ha) of the adjoining previously permitted reclamation area (MCC Ref. DA/20014 ABP Ref. PL.17.129591) to reduce the finished ground level in that part of the reclaimed area by approximately 0.2 m, The increase in ground level on the proposed reclamation area is approximately 1.8m. The development also includes for the repair & reinstatement of existing internal haul road; creation of a hard standing area of approximately 135 sqm surrounded by a 0.45m high wall; reinstatement of an existing (currently unused) wheel wash and relocation of existing container on site and temporary use as site office
land reclamation works over an area of approximately 3.16ha comprising of the importation of inert soil (approximately 96,700 tonnes); and the redistribution of approximately 1,300 tonnes of soil from part (0.35ha) of the adjoining previously permitted reclamation area (MCC Ref. DA/20014 ABP Ref. PL.17.129591) to reduce the finished ground level in that part of the reclaimed area by approximately 0.2 m, The increase in ground level on the proposed reclamation area is approximately 1.8m. The proposed development also includes for the repair & reinstatement of existing internal haul road; creation of a hard standing area of approximately 135 sqm surrounded by a 0.45m high wall; reinstatement of an existing (currently unused) wheel wash and relocation of existing container on site and temporary use as site office. Significant further information/revised plans submitted on this application
No Environment Impact Assesments Associated with this Application