Planning application details ref: RA150972 Meath CoCo

100%100% Complete (warning)

Planning Application: RA150972 (Meath CoCo)
File Number: RA150972
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 16/09/2015 Decision Due Date: 10/11/2015
Validated Date: 16/09/2015 Invalidated Date:
Further Info Requested: Further Info Received:
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 27/10/2015
Leave to Appeal: Appeal Date:
Commenced Date: Submissions By: 20/10/2015

Applicant Details

Applicant name: Hickwell Ltd.
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: development at a site at The Hub Logistics Park, Bracetown (and including lands within the townlands of Bracetown, Gunnocks & Portmanna), Clonee, County Meath. A 10 year permission is being sought. The development will consist of an extension to the existing logistics park, permitted under Reg. Ref. DA50233, comprising of 3 no. additional logistics, warehousing and light industrial units of 6,480sqm; 9,792sqm and 12,672sqm gross floor area, respectively (total gross floor area of 28,944sqm), all with a maximum building height of approximately 15.75m. Access to the proposed development will be via the existing entrance and internal access route to The Hub Logistics Park. The development provides for the extension of and provision of new internal roads; a total of 266 no. surface car parking spaces; and all associated heavy goods, vehicle parking, loading and docking bays. The development also includes associated and ancillary site development works including attenuation pond to serve the proposed units, site services; landscaping, boundary treatments; lighting; and all associated site development and works
Development Address: The Hub Logistics Park, Bracetown (and including lands within the townlands, of Bracetown; Gunnocks & Portmanna), Clonee, Co. Meath
Architect Name: Declan Brassil & Co. Ltd Location Key: BRACETOWN
Electoral Division: Incorrect Icl Voter Recor Planner: None
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 27/10/2015 Manager Order: R1281/15
Decision Type: Conditional Number of Conditions: 14
Grant Date: 01/12/2015 Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date: 30/11/2025
Decision Description: development at a site at The Hub Logistics Park, Bracetown (and including lands within the townlands of Bracetown, Gunnocks & Portmanna), Clonee, County Meath. A 10 year permission is being sought. The development will consist of an extension to the existing logistics park, permitted under Reg. Ref. DA50233, comprising of 3 no. additional logistics, warehousing and light industrial units of 6,480sqm; 9,792sqm and 12,672sqm gross floor area, respectively (total gross floor area of 28,944sqm), all with a maximum building height of approximately 15.75m. Access to the proposed development will be via the existing entrance and internal access route to The Hub Logistics Park. The development provides for the extension of and provision of new internal roads; a total of 266 no. surface car parking spaces; and all associated heavy goods, vehicle parking, loading and docking bays. The development also includes associated and ancillary site development works including attenuation pond to serve the proposed units, site services; landscaping, boundary treatments; lighting; and all associated site development and works

Appeal Details


Appeal Details
Notification Date: BP Reference #:
Appeal Type: File Forward Date:
Submission Due Date: Submission Sent Date:
Appeal Decision: Decision Date:
Withdrawn Date: Dismissed Date:
Reason: