(a) the erection of a new prefabricated building comprising three classrooms with toilets and hallways; (b) the replacement of one of the existing prefabricated classrooms with a larger prefabricated classroom; and (c) the addition to this larger prefabricated classroom of a further prefabricated classroom with hallways and toilets together with all associated site works to the rear of St. Mary's GAA Clubhouse at Ballydoogan, Sligo. This application does not relate to a protected structure. An Integrated Waste Licence is not required in this case. The proposed development is not located in a strategic development zone (SDZ).
Development Address:
Gaelscoil Chnoc na Re, St. Mary's GAA Club, Ballydoogan, Sligo
Architect Name:
Location Key:
BALLYDOOGAN
Electoral Division:
Planner:
None
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
25/08/2003
Manager Order:
165/03
Decision Type:
Conditional
Number of Conditions:
3
Grant Date:
08/10/2003
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
07/10/2008
Decision Description:
(a) the erection of a new prefabricated building comprising three classrooms with toilets and hallways; (b) the replacement of one of the existing prefabricated classrooms with a larger prefabricated classroom; and (c) the addition to this larger prefabricated classroom of a further prefabricated classroom with hallways and toilets together with all associated site works to the rear of St. Mary's GAA Clubhouse at Ballydoogan, Sligo. This application does not relate to a protected structure. An Integrated Waste Licence is not required in this case. The proposed development is not located in a strategic development zone (SDZ).
for removal of existing (3 no). Modular Prefabricated Units consisting of 6 no. classrooms, demolition of their associated block work support bases and the installation of a new prefabricated two storey modular structure with associated block work support base comprising of 9 no. classrooms, offices, toilet facilities, storage, specialist support rooms and staff room with an overall floor area of 971m2
Páirc Dick Kent Ballydoogan Road Upper Ballydoogan
Development consisting of (1) retention of ballstop netting, (2) retention of floodlighting poles and completion of floodlighting and (3) retention of boundary fencing.
Pairc Dick Kent Ballydoogan Road Upper Ballydoogan
development consisting of (1) retention of ballstop netting. (2) retention of floodlighting poles (3) retention of boundary fencing and (4) permission for completion of floodlighting