File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
0170073 |
APPLICATION FINALISED |
PERMISSION |
C |
14/06/2001 Thursday |
Gaelscoil Chnoc na Re |
Gaelscoil Chnoc na Re St Mary's GAA Clubhouse Ballydoogan |
for the erection of a prefabricated building comprising of Two classrooms, toilets and hallway together with septic tank and percolation area to the rear of St Mary's GAA Clubhouse Ballydoogan. |
0370066 |
APPLICATION FINALISED |
PERMISSION |
C |
26/05/2003 Monday |
Cathal O'Donaill |
Gaelscoil Chnoc na Re St. Mary's GAA Club Ballydoogan |
(a) the erection of a new prefabricated building comprising three classrooms with toilets and hallways; (b) the replacement of one of the existing prefabricated classrooms with a larger prefabricated classroom; and (c) the addition to this larger prefabricated classroom of a further prefabricated classroom with hallways and toilets together with all associated site works to the rear of St. Mary's GAA Clubhouse at Ballydoogan, Sligo. This application does not relate to a protected structure. An Integrated Waste Licence is not required in this case. The proposed development is not located in a strategic development zone (SDZ). |
0570013 |
APPLICATION FINALISED |
PERMISSION |
C |
08/02/2005 Tuesday |
St. Mary's G.F.C. |
Ballydoogan Sligo |
to carry out extensions and modifications to St. Mary's clubhouse together with all associated site works at Ballydoogan, Sligo. The works shall comprise the provision of new two-story entrance foyer, gross floor area 30sqm, the provision of single story rear extension gross floor area 170 sq. m, the upgrading of elevations to provide new fenestration. |
0970038 |
APPLICATION FINALISED |
PERMISSION |
C |
13/05/2009 Wednesday |
Bartley O'Gabhain |
St. Mary's G. A. A. Ground, Ballydoogan, Sligo. |
for removal of existing (3 no). Modular Prefabricated Units consisting of 6 no. classrooms, demolition of their associated block work support bases and the installation of a new prefabricated two storey modular structure with associated block work support base comprising of 9 no. classrooms, offices, toilet facilities, storage, specialist support rooms and staff room with an overall floor area of 971m2 |
14190 |
APPLICATION FINALISED |
PERMISSION |
C |
24/06/2014 Tuesday |
Bartley O'Gabhain, Chairman, BoM Gaelscoil Cnoc na Re |
St Mary's GAA Ground Ballydoogan Sligo |
(1) installation of a new prefabricated unit containing 1 no classroom to south elevation of existing prefabricated unit containing 3 no classrooms (new block to contain 4 no classrooms); (2) installation of new prefabricated unit containing 1 no classroom to north elevation of existing prefabricated unit containing 2 no classrooms (new block to contain 3 no classrooms) and (3) installation of new prefabricated unit containing 2 no resource classrooms with all associated block work support bases and site works |
16321 |
APPLICATION FINALISED |
PERMISSION |
C |
08/08/2016 Monday |
Bartley O'Gabhain, Chairman, Board of Managment |
Gaelscoil Chnoc Na Re St. Marys GAA Ground Ballydoogan |
development consisting of 3 no. prefabricated classrooms (each 80 sqm in floor area) including associated site works
|
9874559 |
APPLICATION FINALISED |
PERMISSION |
C |
18/09/1998 Friday |
St Marys G.A.A. Club |
St Marys G.A.A. Club Ballydoogan Sligo |
construct extension to existing clubhouse conversion of existing squash court and change of use to school accommodation, retention of existing temporary classrooms and toilets |