alterations to office accommodation granted planning permission, Ref, No. 06/11, not yet constructed. The alterations comprise of 1. Relocation of fire escape stairwell to South East corner, 2. Reduction in depth of recess to North elevations, 3. Increase in floor area of 161 sq.m. 4. New entrance onto Finisklin Industrial Estate Road at North West boundary at
Development Address:
Finisklin Industrial Estate,, Finisklin,, Sligo.
Architect Name:
Location Key:
FINISKLIN
Electoral Division:
100
Planner:
None
Social Housing Exempt:
Plan Enforcement #:
ENF 10/8
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
26/07/2007
Manager Order:
228/2007
Decision Type:
Conditional
Number of Conditions:
4
Grant Date:
29/08/2007
Grant Managers Order #:
228/07
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
28/08/2012
Decision Description:
alterations to office accommodation granted planning permission, Ref, No. 06/11, not yet constructed. The alterations comprise of 1. Relocation of fire escape stairwell to South East corner, 2. Reduction in depth of recess to North elevations, 3. Increase in floor area of 161 sq.m. 4. New entrance onto Finisklin Industrial Estate Road at North West boundary at
extensions to offices of existing factory, comprising of 119 sq.m. extension to existing ground floor office accommodation and addition of first and second floor office accommodation of 483 sq.m. per floor, car parking to increase to 199 spaces, and associated site works
development consisting of a single storey extension to the south side (rear) of the existing factory building, sized 333m2 and approx. 5.6m high with external plant located on the flat roof over; a single storey extension to the east side of the existing factory building containing an ESB substation and switchroom, sized 29m2 and approx. 3.0m high with adjacent transformer; a single storey extension to the east side of the existing factory building containing a lobby, sized 8m2 and approx. 3.0m high and new canopy to rear (south) elevation, approx. 6.1m high, including associated demolitions. The works include minor modifications to the existing facades and additional escape ladders, external plant equipment located on the west side of the building, new vehicular access gate to the west boundary fence and extension to existing rear concrete yard, sized 224m2 at Fort Gary Label and Pack Facility, also known as Fort Gary 1, Fort Gary Buisness Centre
No Environment Impact Assesments Associated with this Application