development consisting of a single storey extension to the south side (rear) of the existing factory building, sized 333m2 and approx. 5.6m high with external plant located on the flat roof over; a single storey extension to the east side of the existing factory building containing an ESB substation and switchroom, sized 29m2 and approx. 3.0m high with adjacent transformer; a single storey extension to the east side of the existing factory building containing a lobby, sized 8m2 and approx. 3.0m high and new canopy to rear (south) elevation, approx. 6.1m high, including associated demolitions. The works include minor modifications to the existing facades and additional escape ladders, external plant equipment located on the west side of the building, new vehicular access gate to the west boundary fence and extension to existing rear concrete yard, sized 224m2 at Fort Gary Label and Pack Facility, also known as Fort Gary 1, Fort Gary Buisness Centre
development consisting of a single storey extension to the south side (rear) of the existing factory building, sized 333m2 and approx. 5.6m high with external plant located on the flat roof over; a single storey extension to the east side of the existing factory building containing an ESB substation and switchroom, sized 29m2 and approx. 3.0m high with adjacent transformer; a single storey extension to the east side of the existing factory building containing a lobby, sized 8m2 and approx. 3.0m high and new canopy to rear (south) elevation, approx. 6.1m high, including associated demolitions. The works include minor modifications to the existing facades and additional escape ladders, external plant equipment located on the west side of the building, new vehicular access gate to the west boundary fence and extension to existing rear concrete yard, sized 224m2 at Fort Gary Label and Pack Facility, also known as Fort Gary 1, Fort Gary Buisness Centre
extensions and alterations to office building, granted permission, (ref. No. PD 169/00) currently under construction, to include. 1. A three storey extension to south elevation comprising 510sq.m. of additional office space. 2. Re-positioning of stairwell at north elevation to give 77sq.m. additional office space. 3. Removal of facing stone work to be replaced with coloured steel sheeting. 4. New car-parking layout to increase parking spaces from 60 to 112.5. New entrance to site from cul-de-sac spur road off the main Finisklin Industrial Estate road
extensions to offices of existing factory, comprising of 119 sq.m. extension to existing ground floor office accommodation and addition of first and second floor office accommodation of 483 sq.m. per floor, car parking to increase to 199 spaces, and associated site works
alterations to office accommodation granted planning permission, Ref, No. 06/11, not yet constructed. The alterations comprise of 1. Relocation of fire escape stairwell to South East corner, 2. Reduction in depth of recess to North elevations, 3. Increase in floor area of 161 sq.m. 4. New entrance onto Finisklin Industrial Estate Road at North West boundary at