File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
1270040 |
APPLICATION FINALISED |
PERMISSION |
C |
14/06/2012 Thursday |
Health Service Executive North West |
The Mall Rathquarter Sligo |
the provision of additional car parking spaces at Sligo General Hospital consisting of: (a) new permanent surface car park, adjacent to existing hospital entrance off Ash Lane, comprising of 220 spaces with access from the new hospital ring road and associated surface water drainage, retaining walls, landscaping and public lighting and (b) extension of existing surface car park adjacent to existing helipad and ambulance base, comprising a net increase of 55 spaces (proposed spaces = 90, existing spaces = 35) with access from the new hospital ring road and associated bulk excavation to reduce levels, surface water drainage, retaining wall, landscaping and public lighting at Sligo General Hospital |
1370063 |
APPLICATION FINALISED |
PERMISSION |
C |
01/10/2013 Tuesday |
Health Service Executive |
The Mall Rathquarter Sligo |
amended design of previously granted single storey mortuary extension to consist of 2 no viewing rooms, 2 no family rooms, reception area, office and toilets and associated site works as described on the drawings (previous Planing Ref: PD 12/61 refers) at Sligo Regional Hospital |
15299 |
APPLICATION FINALISED |
PERMISSION |
C |
03/09/2015 Thursday |
The Health Services Executive (HSE North West) |
Sligo Regional Hospital The Mall Rathquarter |
development consisting of the construction of a new gas compound with associated works |
15329 |
APPLICATION FINALISED |
PERMISSION |
C |
28/09/2015 Monday |
The Health Service Executive North West |
Sligo Regional Hospital The Mall Rathquarter |
development consisting of the demolition of an existing temporary building and replacement with a new temporary 2 storey modular building, accommodation includes offices and meeting rooms and the new building is with the curtilage of a Protected Structure
|
18327 |
APPLICATION FINALISED |
PERMISSION |
C |
10/08/2018 Friday |
The Health Service Executive (HSE North West) |
Sligo Regional Hospital The Mall Rathquarter |
Development consisting of a new gas compound and demolition of brick chimney with associated works (consisting of new 100m2 concrete base with perimeter fencing and retaining wall for 1 no lpg tank, new gas pipe to fill point at proposed layby with protective fencing, new footpath to access existing staff car park, new layby to existing high access road with associated new steps from proposed layby down to proposed tank base level, new boiler house of 4.0m2 area and 2.9m height with associated ductwork and demolition of existing 18.1m high brick chimney at existing boiler house)
|
19200 |
WITHDRAWN |
RETENTION |
|
27/05/2019 Monday |
The Health Services Executive (HSE North West) |
Sligo University Hospital, The Mall, Sligo. |
for the retention of temporary accommodation previously granted under PL 05/148 (5 year temporary permission). The accommodation comprises an 33.6m2 Modular Unit providing Paediatric Diabetes Services. It is intended that this accommodation would be removed from the site with in a period of 5 years from grant of retention permission
|