0170159 |
APPLICATION FINALISED |
PERMISSION |
C |
11/12/2001 Tuesday |
North Western Health Board |
Ballytivnan Sligo
|
or construction works to facilitate future hospital development at Sligo General Hospital, Rathquarter, Sligo. consisting of (a) bulk dig to reduce levels , new internal road and surface car parking , associate surface waher drainage, landscaping & public lighting , demolition of one permanent & 3 semi permanentbuildings, relocation odf bulk oxygen storage tank, decommissioning & removal of existing helipad facility, provision of temporary construction access onto Ash Laneall at Sligo General Hospotal, The Mall, Rathquarter, sligo. (b). Disposal of surplusexcavated material arising from construction works as described in (a) to Nort Western Health Board lands at |
0970004 |
APPLICATION FINALISED |
PERMISSION |
C |
23/01/2009 Friday |
The Health Service Executive |
Sligo General Hospital The Mall Sligo |
and retention permission for development consisting of the retention of the existing temporary parking (4514 sq.m) and construction of 150 no. temporary car parking spaces (3313 sq.m), light standards, landscaping and associated site works at |
1070053 |
APPLICATION FINALISED |
PERMISSION |
C |
26/10/2010 Tuesday |
Health Service Executive North West |
Sligo General Hopsital The Mall, Rathquarter, |
for development to facilitate future hospital development at Sligo General Hospital consisting of: (a) New internal road and associated roundabout, footpath, surface water drainage, retaining walls, landscaping and public lighting; bult excavation to reduce levels; temporary surface carparking comprising 150 spaces with layout and extent revised from carpark layout previously approved under grant of permission (PL09/4); relocation of bulk oxygen storage tank; disposal of surplus excavated material arising from road construction works on site at proposed temporary surface carpark and between proposed road and Ash Lane, landscaping of embankments associated with surplus spoil disposal area, provision of temporary construction access on Ash Lane, all at Sligo General Hospital (b) Disposal of surplus excavated material arising from the construction works as described above to HSE Northwest lands at Ballytivnan Sligo. |
1270061 |
APPLICATION FINALISED |
PERMISSION |
C |
27/08/2012 Monday |
Health Service Executive |
Sligo General Hospital The Mall Rathquarter |
for the removal of 2 no. prefabs to make provision for a single storey mortuary extension to consist of 2 no. viewing rooms, 2 no. family rooms, reception area, office and toilets and associated site works as described on the drawings |
1370011 |
INCOMPLETED APPLICATION |
PERMISSION |
|
08/02/2013 Friday |
The Health Services Executive (HSE North West) |
The Mall Rathquarter Sligo |
construction of a 746m2 development at Level 7 & 8 of the Multi-storey block over the existing Level 6 Research & Education Library. The development shall comprise (1) a Medical Education & Training Centre including links to the main hospital circulation core at Level 7 & 8 and associated Air Handling Plant at roof level and (2) the removal from site of the existing temporary buildings which currently house the Education & Training Centre located adjacent to the Connaughton Road access. The development shall also comprise site development works, site signage and connections to existing site services infrastructure at Sligo Regional Hospital |
1370014 |
APPLICATION FINALISED |
PERMISSION |
C |
18/02/2013 Monday |
The Health Service Executive (HSE North West) |
Sligo Regional Hospital The Mall Rathquarter |
for the construction of a 746m2 development at level 7 & 8 of the multi-storey block over the existing level 6 research & education library at Sligo Regional Hospital. The development shall comprise (1) a medical education and training centre including links to the main hospital circulation core at level 7 & 8 and associated air handling plant at roof level, (2) the removal from site of the existing temporary buildings which currently houses the education & training centre located adjacent to the Connaughton Road access. The development shall also comprise site development works, site signage and connections to existing site services infrastructure |
1370060 |
INCOMPLETED APPLICATION |
PERMISSION |
|
10/09/2013 Tuesday |
Health Service Executive, North West |
Sligo General Hospital The Mall Rathquarter |
the removal of the existing 1.1m high steel railings which extend approximatley 39 m to reach side of the main hsopital entrance at Ash Lane and replace them with new cut limestone clad piers and walls (typically 0.6m in height) topped with steel railings (overall height of wall and railing 1.6m typically) |
1370061 |
APPLICATION FINALISED |
PERMISSION |
C |
17/09/2013 Tuesday |
Health Services Executive North West |
The Mall Rathquarter Sligo |
removal of the existing 1.1m high steel railings which extend approximately 39m to each side of the main hospital entrance at Ash Lane and replacement with new cut limestone clad piers and walls topped with steel railings at Sligo General Hospital |
15299 |
APPLICATION FINALISED |
PERMISSION |
C |
03/09/2015 Thursday |
The Health Services Executive (HSE North West) |
Sligo Regional Hospital The Mall Rathquarter |
development consisting of the construction of a new gas compound with associated works |
18327 |
APPLICATION FINALISED |
PERMISSION |
C |
10/08/2018 Friday |
The Health Service Executive (HSE North West) |
Sligo Regional Hospital The Mall Rathquarter |
Development consisting of a new gas compound and demolition of brick chimney with associated works (consisting of new 100m2 concrete base with perimeter fencing and retaining wall for 1 no lpg tank, new gas pipe to fill point at proposed layby with protective fencing, new footpath to access existing staff car park, new layby to existing high access road with associated new steps from proposed layby down to proposed tank base level, new boiler house of 4.0m2 area and 2.9m height with associated ductwork and demolition of existing 18.1m high brick chimney at existing boiler house)
|
18392 |
APPLICATION FINALISED |
EXTENTION OF DURATION |
C |
28/09/2018 Friday |
|
Sligo University Hospital The Mall Sligo |
Development consisting of an extension to the southern elevation of Sligo University Hospital. The development will consist of; 1) alterations to the existing Out Patients Car Park, 2) provision of a new fire tender vehicular entrance from The Mall; 3)Relocation of the existing CAT Scan unit with connecting corridor at Level 3 concourse; 4) construction of an extension (4019m2) over five storeys with connections to the existing circulation routes at levels 2, 3, 4, 5 and 6 of the hospital. The extension accommodation at each level will contain following; Level 2 - Staff rooms, services accommmodation and connection to existing hospital; Level 3 & 4 - New ward with 23 no. single rooms with en-suite, associated service rooms and connection to hospital concourse at level 3 and and corridor at level 4; Level 5 & 6 - for healthcare future fit out; roof top plant rooms; 5) construction of a single tier multi storey car parking area above existing parking area to the northern boundary of the hospital complex with the provision of 90 no. parking spaces; 6) all associated landscaping, site works and services. Sligo University Hospital is a Protected Structure. The proposed extension is not in immediate contact with the protected structure.
|
19200 |
WITHDRAWN |
RETENTION |
|
27/05/2019 Monday |
The Health Services Executive (HSE North West) |
Sligo University Hospital, The Mall, Sligo. |
for the retention of temporary accommodation previously granted under PL 05/148 (5 year temporary permission). The accommodation comprises an 33.6m2 Modular Unit providing Paediatric Diabetes Services. It is intended that this accommodation would be removed from the site with in a period of 5 years from grant of retention permission
|
20298 |
APPLICATION FINALISED |
PERMISSION |
C |
07/09/2020 Monday |
The Health Services Executive (HSE North West) |
South East Corner of Sligo Regional Hospital The Mall Rathquarter |
development consisting of the construction of a 332.5m2 development at Level 8 & roof level of the multi-storey block over the existing Paediatric Department on level 7. The development shall comprise (1) New 258 m2 extension to the existing Intensive Care Ward at level 8 consisting of 4 new isolation rooms with associated stores, utility rooms, circulation areas and access off existing isolation ward (2) Construction of new 74.5m2 associated plant room at roof level, with all associated connections to existing site services infrastructure. Sligo University Hospital Campus contains a Protected Structure RPS no 217SE. The proposed extensions not in immediate contact with the protected structure.
|
20359 |
INCOMPLETED APPLICATION |
PERMISSION |
|
16/10/2020 Friday |
The Health Service Executive |
Sligo University Hospital The Mall Sligo |
development consisting of alteration to the previously approved application reference number PL18/392 at Sligo University Hospital. The development will consist of alterations to the previously approved single tier multi storey car parking area located above the existing parking area to the northern boundary of the hospital complex. The proposed alteration includes the provision of an additional 74 car parking spaces to provide a total of 164 parking spaces above the existing car park, direct access from the existing circulation road within hospital grounds, associated landscaping, site works and services. Sligo University Hospital is a Protected Structure. The proposed car park is not in immediate contact with the protected structure |
20375 |
APPLICATION FINALISED |
PERMISSION |
C |
29/10/2020 Thursday |
Health Service Executive |
Sligo University Hospital The Mall, Rathquarter |
PP - development consisting of alterations to the previously approved application reference number PL18/392. The development will consist of alterations to the previously approved single tier multi storey car parking area located above the existing parking area to the northern boundary of the hospital complex. The proposed alteration includes the provision of an additional 74 car parking spaces to provide a total of 164 parking spaces above the existing car park, direct access from the existing circulation road within hospital grounds, associated landscaping, site works and services. Sligo University Hospital is a Protected Structure. The proposed car park is not in immediate contact with the protected structure.
|