0170159 |
APPLICATION FINALISED |
PERMISSION |
C |
11/12/2001 Tuesday |
North Western Health Board |
Ballytivnan Sligo
|
or construction works to facilitate future hospital development at Sligo General Hospital, Rathquarter, Sligo. consisting of (a) bulk dig to reduce levels , new internal road and surface car parking , associate surface waher drainage, landscaping & public lighting , demolition of one permanent & 3 semi permanentbuildings, relocation odf bulk oxygen storage tank, decommissioning & removal of existing helipad facility, provision of temporary construction access onto Ash Laneall at Sligo General Hospotal, The Mall, Rathquarter, sligo. (b). Disposal of surplusexcavated material arising from construction works as described in (a) to Nort Western Health Board lands at |
0970004 |
APPLICATION FINALISED |
PERMISSION |
C |
23/01/2009 Friday |
The Health Service Executive |
Sligo General Hospital The Mall Sligo |
and retention permission for development consisting of the retention of the existing temporary parking (4514 sq.m) and construction of 150 no. temporary car parking spaces (3313 sq.m), light standards, landscaping and associated site works at |
1070053 |
APPLICATION FINALISED |
PERMISSION |
C |
26/10/2010 Tuesday |
Health Service Executive North West |
Sligo General Hopsital The Mall, Rathquarter, |
for development to facilitate future hospital development at Sligo General Hospital consisting of: (a) New internal road and associated roundabout, footpath, surface water drainage, retaining walls, landscaping and public lighting; bult excavation to reduce levels; temporary surface carparking comprising 150 spaces with layout and extent revised from carpark layout previously approved under grant of permission (PL09/4); relocation of bulk oxygen storage tank; disposal of surplus excavated material arising from road construction works on site at proposed temporary surface carpark and between proposed road and Ash Lane, landscaping of embankments associated with surplus spoil disposal area, provision of temporary construction access on Ash Lane, all at Sligo General Hospital (b) Disposal of surplus excavated material arising from the construction works as described above to HSE Northwest lands at Ballytivnan Sligo. |
1270040 |
APPLICATION FINALISED |
PERMISSION |
C |
14/06/2012 Thursday |
Health Service Executive North West |
The Mall Rathquarter Sligo |
the provision of additional car parking spaces at Sligo General Hospital consisting of: (a) new permanent surface car park, adjacent to existing hospital entrance off Ash Lane, comprising of 220 spaces with access from the new hospital ring road and associated surface water drainage, retaining walls, landscaping and public lighting and (b) extension of existing surface car park adjacent to existing helipad and ambulance base, comprising a net increase of 55 spaces (proposed spaces = 90, existing spaces = 35) with access from the new hospital ring road and associated bulk excavation to reduce levels, surface water drainage, retaining wall, landscaping and public lighting at Sligo General Hospital |
1370060 |
INCOMPLETED APPLICATION |
PERMISSION |
|
10/09/2013 Tuesday |
Health Service Executive, North West |
Sligo General Hospital The Mall Rathquarter |
the removal of the existing 1.1m high steel railings which extend approximatley 39 m to reach side of the main hsopital entrance at Ash Lane and replace them with new cut limestone clad piers and walls (typically 0.6m in height) topped with steel railings (overall height of wall and railing 1.6m typically) |
15299 |
APPLICATION FINALISED |
PERMISSION |
C |
03/09/2015 Thursday |
The Health Services Executive (HSE North West) |
Sligo Regional Hospital The Mall Rathquarter |
development consisting of the construction of a new gas compound with associated works |
15329 |
APPLICATION FINALISED |
PERMISSION |
C |
28/09/2015 Monday |
The Health Service Executive North West |
Sligo Regional Hospital The Mall Rathquarter |
development consisting of the demolition of an existing temporary building and replacement with a new temporary 2 storey modular building, accommodation includes offices and meeting rooms and the new building is with the curtilage of a Protected Structure
|
18327 |
APPLICATION FINALISED |
PERMISSION |
C |
10/08/2018 Friday |
The Health Service Executive (HSE North West) |
Sligo Regional Hospital The Mall Rathquarter |
Development consisting of a new gas compound and demolition of brick chimney with associated works (consisting of new 100m2 concrete base with perimeter fencing and retaining wall for 1 no lpg tank, new gas pipe to fill point at proposed layby with protective fencing, new footpath to access existing staff car park, new layby to existing high access road with associated new steps from proposed layby down to proposed tank base level, new boiler house of 4.0m2 area and 2.9m height with associated ductwork and demolition of existing 18.1m high brick chimney at existing boiler house)
|
19200 |
WITHDRAWN |
RETENTION |
|
27/05/2019 Monday |
The Health Services Executive (HSE North West) |
Sligo University Hospital, The Mall, Sligo. |
for the retention of temporary accommodation previously granted under PL 05/148 (5 year temporary permission). The accommodation comprises an 33.6m2 Modular Unit providing Paediatric Diabetes Services. It is intended that this accommodation would be removed from the site with in a period of 5 years from grant of retention permission
|