File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
04510813 |
INCOMPLETED APPLICATION |
PERMISSION |
|
24/05/2004 Monday |
Centenary Co-op Society Ltd |
Manselstown Ballyduff Thurles |
alter 2 No. grain storage buildings as follows; (1) Remove existing asbestos roofing and wall cladding and replace with insulated roof and wall panel and to replace existing roller shutter door with auto roller shutter door. (2) to remove existing asbestos roofing and wall cladding and replace with insulated roof and wall panels and to extend existing concrete walls to eaves level and to replace existing roller shutter door with new roller shutter door |
04510891 |
INCOMPLETED APPLICATION |
PERMISSION |
|
08/06/2004 Tuesday |
Centenary Co-Op Society Ltd., |
Manselstown Td., Ballyduff Thurles |
A. New 4m high x 7m long concrete wall adjacent to existing grain silo no. 3 B. Removal of high level existing roof sheeting and replacement with new insulated roof panel sheeting adjacent to existing Cymbria dryer. C. Construction of 2 no. new concrete walls 3m high x 5m long at existing intake C. D. Construction of 3 no. perimeter concrete walls 3m high with new insulated flat roof adjacent to existing intake B. E. Construction of 2 no. new concrete walls 2m high x 4m long adjacent to existing intake B. F. Construction of insulated panel housing units to 3 no. existing silo fans to be 2m wide x 2m high x 3m long to include for louvered insulated access door to each unit at existing grain silos nos. 1, 2 & 3. G. Construction of insulated panel housing to 10 no. fans to be 4m long x 2m wide x 1.6m high to include 1 no. louvered access door to each housing unit at existing barley store at their site at Manselstown Td., Ballyduff, Thurles, Co. Tipperary |
04511012 |
APPLICATION FINALISED |
PERMISSION |
C |
29/06/2004 Tuesday |
Centenary Co-op Society Ltd |
Manselstown Ballyduff Thurles |
for the construction of (a) New 4m high x 7m long concrete wall adjacent to existing grain silo No. 3; (b) removal of high level existing roof sheeting and replacement with new insulated roof panel sheeting adjacent to existing Cymbria dryer; (c) construction of 2 No. new concrete walls 3m high x 5m long at existing intake C; (d) construciton of 3 No. perimeter concrete walls 3m high with new insulated flat roof adjacent to existing intake B; (e) construction of 2 No. new concrete walls 2m high x 4m long adjacent to existing intake B; (f) construction of insulated panel housing units to 3 No. existing silo fans to be 2m wide x 2m high x 3m long to include for louvered insulated access door to each unit at existing grain silos No's 1, 2 & 3; (g)construction of insulated panel housing to 10 No. fans to be 4m long x 2m wide x 1.6m high to include 1 No. louvered access door to each housing unit at existing barley store |
05510607 |
WITHDRAWN |
PERMISSION |
|
27/05/2005 Friday |
Centenary Co-op Society Ltd., |
Manselstown TD., Ballyduff Thurles |
Bio-Diesel production facility consisting of Laboratory, Administration Building, Utilities Building, Process Building, Input/Output Station, 12 No. Bunded Storage Tanks, Water Storage Tank, Bio-Diesel Environmental Statement, Electrical Container, Weighbridge, Treatment Plant with percolation area, car park, access road with new site entrance from public roadway and associated site works |
05511077 |
APPLICATION FINALISED |
PERMISSION |
C |
14/09/2005 Wednesday |
Centenary Co-Op Society Ltd., |
Manselstown Td., Ballyduff Thurles |
Construct a Bio-Diesel production facility comprising of laboratory and administration building, utilities building, process building, input/output station, 12 No. bunded storage tanks, water storage tank, electrical container, weighbridge, treatment plant with percolation area, fire water retention facilities, storm water retention facilities, car park, access road with new site entrance with public roadway and associated site works. This application requires an IPPC licence. An Environmental Impact Statement will be submitted to the planning authority with this application. |
08510819 |
APPLICATION FINALISED |
PERMISSION |
C |
06/08/2008 Wednesday |
Centenary Thurles Co-op Society Ltd |
Manselstown Td Ballyduff Thurles |
construct a new twenty thousand tonne grain store and associated site works |
5116849 |
APPLICATION FINALISED |
PERMISSION |
C |
19/12/1994 Monday |
CENTENARY CO-OP |
MANSELSTOWN
|
NEW BULK-OUTLOADING BINS IN FEEDMILL INCL. WEIGHBRIDGE. |
5119272 |
APPLICATION FINALISED |
PERMISSION |
C |
06/01/1998 Tuesday |
Centenary Co-Op Creamery Society Ltd, |
Manselstown, Ballyduff, T hurles
|
Erection of new grain store, drier building, storage silos, interlinking conveyors, dust collection house & site boundary fencing |
5124528 |
APPLICATION FINALISED |
PERMISSION |
C |
19/10/2001 Friday |
Centenary Co-Op Creamery Society Ltd. |
Manseltown, Ballyduff, Th urles
|
New store for fertilizer |