Alter 2 No. grain storage buildings as follows; (a) remove existing asbestos roofing and wall cladding and replace with insulated roof and wall panel and to replace existing roller shutter door with auto roller shutter door. (b) remove existing asbestos roofing and wall cladding and replace with insulated roof and wall panels and to extend existing concrete walls to eaves level and to replace existing roller shutter door with new roller shutter door
A. New 4m high x 7m long concrete wall adjacent to existing grain silo no. 3 B. Removal of high level existing roof sheeting and replacement with new insulated roof panel sheeting adjacent to existing Cymbria dryer. C. Construction of 2 no. new concrete walls 3m high x 5m long at existing intake C. D. Construction of 3 no. perimeter concrete walls 3m high with new insulated flat roof adjacent to existing intake B. E. Construction of 2 no. new concrete walls 2m high x 4m long adjacent to existing intake B. F. Construction of insulated panel housing units to 3 no. existing silo fans to be 2m wide x 2m high x 3m long to include for louvered insulated access door to each unit at existing grain silos nos. 1, 2 & 3. G. Construction of insulated panel housing to 10 no. fans to be 4m long x 2m wide x 1.6m high to include 1 no. louvered access door to each housing unit at existing barley store at their site at Manselstown Td., Ballyduff, Thurles, Co. Tipperary
for the construction of (a) New 4m high x 7m long concrete wall adjacent to existing grain silo No. 3; (b) removal of high level existing roof sheeting and replacement with new insulated roof panel sheeting adjacent to existing Cymbria dryer; (c) construction of 2 No. new concrete walls 3m high x 5m long at existing intake C; (d) construciton of 3 No. perimeter concrete walls 3m high with new insulated flat roof adjacent to existing intake B; (e) construction of 2 No. new concrete walls 2m high x 4m long adjacent to existing intake B; (f) construction of insulated panel housing units to 3 No. existing silo fans to be 2m wide x 2m high x 3m long to include for louvered insulated access door to each unit at existing grain silos No's 1, 2 & 3; (g)construction of insulated panel housing to 10 No. fans to be 4m long x 2m wide x 1.6m high to include 1 No. louvered access door to each housing unit at existing barley store
Bio-Diesel production facility consisting of Laboratory, Administration Building, Utilities Building, Process Building, Input/Output Station, 12 No. Bunded Storage Tanks, Water Storage Tank, Bio-Diesel Environmental Statement, Electrical Container, Weighbridge, Treatment Plant with percolation area, car park, access road with new site entrance from public roadway and associated site works
No Environment Impact Assesments Associated with this Application