Bunkimalta, Bauraglanna, Lackabrack, Knockfune and Foilduff at Keeper Hill
10-year Planning Permission for Bunkimalta Wind Energy Project and will comprise 16 wind turbines, each having a rated electrical output of approximately 2,500 - 3,000 kilowatts, access tracks, a fenced Electrical Transformer Station comprising a single-storey Control Building and Substation, an effluent treatment system, three anemometer masts, repository areas, borrow pits and all associated site works, above and below ground. Each wind turbine will comprise a tower up to a maximum of 100 metres high, with a diameter of about 4 metres at the base. Three blades, up to a maximum of 50 metres in length, will be attached. An Environmental Impact Statement and Natura Impact Statement will be submitted to the Planning Authority with the Application
No Environment Impact Assesments Associated with this Application