Planning Application: 13510035 (Tipperary County Council )
File Number:
13510035
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
07/02/2013
Decision Due Date:
03/04/2013
Validated Date:
07/02/2013
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Refused
Decision Date:
02/04/2013
Leave to Appeal:
Appeal Date:
26/04/2013
Commenced Date:
Submissions By:
13/03/2013
Applicant Details
Applicant name:
ESB Wind Development & Coillte
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
10-year Planning Permission for Bunkimalta Wind Energy Project and will comprise 16 wind turbines, each having a rated electrical output of approximately 2,500 - 3,000 kilowatts, access tracks, a fenced Electrical Transformer Station comprising a single-storey Control Building and Substation, an effluent treatment system, three anemometer masts, repository areas, borrow pits and all associated site works, above and below ground. Each wind turbine will comprise a tower up to a maximum of 100 metres high, with a diameter of about 4 metres at the base. Three blades, up to a maximum of 50 metres in length, will be attached. An Environmental Impact Statement and Natura Impact Statement will be submitted to the Planning Authority with the Application
Development Address:
Bunkimalta, Bauraglanna, Lackabrack,, Knockfune and Foilduff at, Keeper Hill, Co. Tipperary
Architect Name:
Location Key:
BUNKIMALTA, BAURAGLANNA, LACKABRACK
Electoral Division:
150
Planner:
Feargus Wright
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
02/04/2013
Manager Order:
Decision Type:
Refused
Number of Conditions:
1
Grant Date:
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
21/07/2019
Decision Description:
10-year Planning Permission for Bunkimalta Wind Energy Project and will comprise 16 wind turbines, each having a rated electrical output of approximately 2,500 - 3,000 kilowatts, access tracks, a fenced Electrical Transformer Station comprising a single-storey Control Building and Substation, an effluent treatment system, three anemometer masts, repository areas, borrow pits and all associated site works, above and below ground. Each wind turbine will comprise a tower up to a maximum of 100 metres high, with a diameter of about 4 metres at the base. Three blades, up to a maximum of 50 metres in length, will be attached. An Environmental Impact Statement and Natura Impact Statement will be submitted to the Planning Authority with the Application
Bunkimalta/Bauraglanna Lackabrack/Foilduff Keeper Hill
Wind energy project comprising seventeen wind turbines each with a nominal rated capacity of approximately 2.5 MW, access tracks, a fenced electrical compound comprising a single storey control building and switchyard and a 50 metre high anemometer mast. Each wind turbine will comprise a tower up to 70 metres high with a diameter of about 4 metres at the base. Three blades of up to 40 metres in length will be attached.
modifications to the existing entrance from the L-2163 to the Keeper Hill Coillte Forest. This modified entrance will provide access to the permitted Bunkimalta Wind Energy Project. Modifications to the existing forest entrance were previously permitted as part of the Bunkimalta Wind Energy Project planning permission (TCC Reg. Ref. 13/51/0035 and ABP PL 22.241924)