Planning application details ref: 13510035 Tipperary County Council

100%100% Complete (warning)

Planning Application: 13510035 (Tipperary County Council )
File Number: 13510035
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 07/02/2013 Decision Due Date: 03/04/2013
Validated Date: 07/02/2013 Invalidated Date:
Further Info Requested: Further Info Received:
Withdrawn Date: Extend Date:
Decision Type: Refused Decision Date: 02/04/2013
Leave to Appeal: Appeal Date: 26/04/2013
Commenced Date: Submissions By: 13/03/2013

Applicant Details

Applicant name: ESB Wind Development & Coillte
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: 10-year Planning Permission for Bunkimalta Wind Energy Project and will comprise 16 wind turbines, each having a rated electrical output of approximately 2,500 - 3,000 kilowatts, access tracks, a fenced Electrical Transformer Station comprising a single-storey Control Building and Substation, an effluent treatment system, three anemometer masts, repository areas, borrow pits and all associated site works, above and below ground. Each wind turbine will comprise a tower up to a maximum of 100 metres high, with a diameter of about 4 metres at the base. Three blades, up to a maximum of 50 metres in length, will be attached. An Environmental Impact Statement and Natura Impact Statement will be submitted to the Planning Authority with the Application
Development Address: Bunkimalta, Bauraglanna, Lackabrack,, Knockfune and Foilduff at, Keeper Hill, Co. Tipperary
Architect Name: Location Key: BUNKIMALTA, BAURAGLANNA, LACKABRACK
Electoral Division: 150 Planner: Feargus Wright
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 02/04/2013 Manager Order:
Decision Type: Refused Number of Conditions: 1
Grant Date: Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date: 21/07/2019
Decision Description: 10-year Planning Permission for Bunkimalta Wind Energy Project and will comprise 16 wind turbines, each having a rated electrical output of approximately 2,500 - 3,000 kilowatts, access tracks, a fenced Electrical Transformer Station comprising a single-storey Control Building and Substation, an effluent treatment system, three anemometer masts, repository areas, borrow pits and all associated site works, above and below ground. Each wind turbine will comprise a tower up to a maximum of 100 metres high, with a diameter of about 4 metres at the base. Three blades, up to a maximum of 50 metres in length, will be attached. An Environmental Impact Statement and Natura Impact Statement will be submitted to the Planning Authority with the Application

Appeal Details


Appeal Details
Notification Date: 30/04/2013 BP Reference #: 22.241924
Appeal Type: APPLICANT File Forward Date: 03/05/2013
Submission Due Date: 27/05/2013 Submission Sent Date: 17/05/2013
Appeal Decision: CONDITIONAL Decision Date: 22/07/2014
Withdrawn Date: Dismissed Date:
Reason: 27