File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
08520014 |
APPLICATION FINALISED |
PERMISSION |
C |
28/02/2008 Thursday |
Nenagh Mart, Central Auctions, |
Nenagh Mart, Stafford Street, Nenagh, |
to construct one overground effluent storage tank, one overground water tank and associated site works |
09520034 |
APPLICATION FINALISED |
PERMISSION FOR RETENTION |
C |
05/11/2009 Thursday |
Nenagh Mart, Central Auctions, |
Central Auctions, Nenagh Mart, Stafford Street, Nenagh |
to retain existing 47.25m² shed, permission to retain a reduced size over ground effluent storage tank from that was granted planning from permission 08/520014 |
14520006 |
APPLICATION FINALISED |
PERMISSION |
C |
14/02/2014 Friday |
Arrabawn Co-Operative Society Ltd., |
Arrabawn Co-Operative Society Limited., Stafford Street, Nenagh South, |
to carry out an upgrade to current milk process facilities: (a) the demolition of the current two-storey laboratory building and adjoining process building (b) the construction of a new process building incorporating an evaporator building and associated link into existing process area (c) associated site and drainage worrks all within existing dairy processing complex. This application relates to an activity for which an integrated pollution prevention control licence under the EPA Acts 1992 and 2011 is required and is held, no alteration to the existing licence is required. |
14600378 |
INCOMPLETED APPLICATION |
PERMISSION |
|
21/10/2014 Tuesday |
Arrabawn Co-Operative Society Limited |
Stafford Street Nenagh South Nenagh |
extension to an existing boiler house. The proposed development consists of the following (a) extension of an existing boiler house (approx 5.5m X12m X 9m high), extension will be used to house 2 new Natural Gas Boilers, which will replace two existing Oil Fired Boilers, (b) associated site & drainage works all within the existing dairy processing complex. Application relates to an IPPCL is required and is held. A revised licence is being applied for |
16600260 |
APPLICATION FINALISED |
PERMISSION |
C |
29/03/2016 Tuesday |
Arrabawn Co-Operative Society Ltd |
Stafford street Nenagh Co. Tipperary |
to install a noise attenuation structure measuring 3m x 2.5m x 2.4m high above existing roof parapet on three sides of existing dryer vent stack at roof level (+29.90m) located on south eastern corner of dryer building within existing dairy processing complex. This application relates to an activity for which an integrated pollution preventation control licence is required and is held |
18600821 |
APPLICATION FINALISED |
PERMISSION |
C |
29/06/2018 Friday |
Arrabawn Co-Operative Society Ltd |
Stafford Street Nenagh South Nenagh |
development at existing dairy processing facility consisting of 3no. main elements; 1.Re-location of main access to the dairy processing plant frm Stafford St to Kenyon St/Well Rd roundabout junction & upgrade of existing milk intake facilities with assoc. site dev works; 2.Expansion of existing casein processing plant facility; 3.Upgrade of existing WWTP; Element no.1 shall re-locate site access, a)upgrade works to existing Kenyon St/Well Rd roundabout junction;b)new security control building (approx.fl area 69sqm);c)extension/upgrade of existing milk intake facility;d)new facilities for truck cleaning with canopy roof over;e)2no. new truck weighbridges;f)demolition works to facilitate above works including demolition of the former Railway Bar & Suttons Coal Yard properties adjoining Arrabawn Co-op site & demolish of exist security control building within the site;g)all site dev works to include works to boundary walls, fencing & gates, footpaths, internal service roads & roundabout,
car parks, road lighting, drainage, utility services, line marking & signage;h)construction
of temp car park adjacent to Arrabawn Co-op’s head office on Stafford St.
Element no.2- building extensions to existing casein plant building(approx.fl area 2586sqm) to accommodate new process plant installations to facilitate an increase in dairy processing capacity
& all assoc. site works incl relocation of exist external silos, compactor & prefabricated storage unit, removal of existing external storage containers & plant, relocation of internal gateway to the mart site & works to road pavement, utility services & drainage. Element no.3 the installation of wastewater treatment tanks;a)aeration tank 22m dm x 6m high;b)settlement tank l9m dm x 5m high; c)covered sludge tank l2m dm x 5m high along with an extension to exist sludge de-watering building (approx.fl area 37sqm), construction of laboratory/office build(approx.fl area 36sqm), air blower building (approx. fl area 2l2sqm), 2no. air blower enclosure structures(approx.base areas 43sqm & 24sqm), additional plant & equipment installations along with assoc internal access Rd, site works & drainage works all within existing WWT site complex. An EIAR(Environmental Impact Assessment Report) has been submitted. These relate to activities for which an application for review of Industrial Emissions Licence (P0 791-02) is required to the EPA
|
18601093 |
APPLICATION FINALISED |
PERMISSION |
C |
07/09/2018 Friday |
Arrabawn Co-Operative Society Ltd. |
Stafford Street Nenagh South Nenagh |
the construction of a single storey electrical substation building (approx. floor area 39.5 sq. m) within the site of its existing dairy processing facility |
2260663 |
APPLICATION FINALISED |
PERMISSION |
C |
01/12/2022 Thursday |
Arrabawn Co-operative Society Ltd |
Stafford Street Nenagh South Nenagh, Co-Tipperary |
the part demolition of existing stores building and its replacement with a new single storey building to facilitate extension of existing cold store facilities and the provision of a loading dock facility together with all associated site works. The development works relate to activities for which an Industrial Emissions Licence (Reg. No. 791-02) is held. |