File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
14520006 |
APPLICATION FINALISED |
PERMISSION |
C |
14/02/2014 Friday |
Arrabawn Co-Operative Society Ltd., |
Arrabawn Co-Operative Society Limited., Stafford Street, Nenagh South, |
to carry out an upgrade to current milk process facilities: (a) the demolition of the current two-storey laboratory building and adjoining process building (b) the construction of a new process building incorporating an evaporator building and associated link into existing process area (c) associated site and drainage worrks all within existing dairy processing complex. This application relates to an activity for which an integrated pollution prevention control licence under the EPA Acts 1992 and 2011 is required and is held, no alteration to the existing licence is required. |
14600378 |
INCOMPLETED APPLICATION |
PERMISSION |
|
21/10/2014 Tuesday |
Arrabawn Co-Operative Society Limited |
Stafford Street Nenagh South Nenagh |
extension to an existing boiler house. The proposed development consists of the following (a) extension of an existing boiler house (approx 5.5m X12m X 9m high), extension will be used to house 2 new Natural Gas Boilers, which will replace two existing Oil Fired Boilers, (b) associated site & drainage works all within the existing dairy processing complex. Application relates to an IPPCL is required and is held. A revised licence is being applied for |
14600431 |
APPLICATION FINALISED |
PERMISSION |
C |
11/11/2014 Tuesday |
Arrabawn Co-Operative Society Ltd |
Stafford Street Nenagh South Nenagh |
consists of (a) extension to an existing boiler house (approx 6.2m X 12.2m X 9.74m). The extension will be used to house a de-aerator tank, (b) 2 new boiler flues (12m High) (c) associated site and drainage works all within the existing dairy processing complex. The appliation relates to an activity for which an integrated pollution prevention control licence under the EPA Acts 1992 and 2011 is required and is held. A revised integrated pollution prevention control licence is being applied for. |
16600560 |
APPEALED FINANCIAL |
PERMISSION FOR RETENTION |
C |
17/06/2016 Friday |
Vodafone Ireland Limited |
Lawlesstown Ardgeeha Clonmel |
the development consists of an existing 2 no. radio link dishes attached to the southern elevation of the spectator stand at Clonmel Rugby Club and all associated site works including cables and equipment. The development forms part of Vodafone Ireland Limited's existing GSM and 3G Broadband Network. |
18600821 |
APPLICATION FINALISED |
PERMISSION |
C |
29/06/2018 Friday |
Arrabawn Co-Operative Society Ltd |
Stafford Street Nenagh South Nenagh |
development at existing dairy processing facility consisting of 3no. main elements; 1.Re-location of main access to the dairy processing plant frm Stafford St to Kenyon St/Well Rd roundabout junction & upgrade of existing milk intake facilities with assoc. site dev works; 2.Expansion of existing casein processing plant facility; 3.Upgrade of existing WWTP; Element no.1 shall re-locate site access, a)upgrade works to existing Kenyon St/Well Rd roundabout junction;b)new security control building (approx.fl area 69sqm);c)extension/upgrade of existing milk intake facility;d)new facilities for truck cleaning with canopy roof over;e)2no. new truck weighbridges;f)demolition works to facilitate above works including demolition of the former Railway Bar & Suttons Coal Yard properties adjoining Arrabawn Co-op site & demolish of exist security control building within the site;g)all site dev works to include works to boundary walls, fencing & gates, footpaths, internal service roads & roundabout,
car parks, road lighting, drainage, utility services, line marking & signage;h)construction
of temp car park adjacent to Arrabawn Co-op’s head office on Stafford St.
Element no.2- building extensions to existing casein plant building(approx.fl area 2586sqm) to accommodate new process plant installations to facilitate an increase in dairy processing capacity
& all assoc. site works incl relocation of exist external silos, compactor & prefabricated storage unit, removal of existing external storage containers & plant, relocation of internal gateway to the mart site & works to road pavement, utility services & drainage. Element no.3 the installation of wastewater treatment tanks;a)aeration tank 22m dm x 6m high;b)settlement tank l9m dm x 5m high; c)covered sludge tank l2m dm x 5m high along with an extension to exist sludge de-watering building (approx.fl area 37sqm), construction of laboratory/office build(approx.fl area 36sqm), air blower building (approx. fl area 2l2sqm), 2no. air blower enclosure structures(approx.base areas 43sqm & 24sqm), additional plant & equipment installations along with assoc internal access Rd, site works & drainage works all within existing WWT site complex. An EIAR(Environmental Impact Assessment Report) has been submitted. These relate to activities for which an application for review of Industrial Emissions Licence (P0 791-02) is required to the EPA
|
18601093 |
APPLICATION FINALISED |
PERMISSION |
C |
07/09/2018 Friday |
Arrabawn Co-Operative Society Ltd. |
Stafford Street Nenagh South Nenagh |
the construction of a single storey electrical substation building (approx. floor area 39.5 sq. m) within the site of its existing dairy processing facility |
2460779 |
APPLICATION FINALISED |
PERMISSION |
C |
16/09/2024 Monday |
Arrabawn Co-Operative Society Limited |
Arrabawn Co-operative Society Limited Stafford Street, Nenagh Co. Tipperary |
a change of use of part of an existing single storey store building at its existing dairy processing facility; the development works will consist of the following; a) construction of a part two-storey structure within the existing store building to accommodate upgraded packaging facilities; b) building works ancillary to the above including the construction of a new internal stairwell within an existing production area which adjoins the existing store building; c) elevational changes to the existing store building resulting from raising the level of part of its roof to accommodate the above referenced two-storey structure. The development works relate to activities for which an Industrial Emissions Licence (Reg. No. 0791- 03) is held. The raised part of the roof over the existing store building will be at a height of approx. 13.8 metres above ground floor level |