Planning Application: 2360367 (Tipperary County Council )
File Number:
2360367
Application Type:
PERMISSION
Planning Status:
INCOMPLETED APPLICATION
Received Date:
31/05/2023
Decision Due Date:
Validated Date:
Invalidated Date:
01/06/2023
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Decision Date:
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
04/07/2023
Applicant Details
Applicant name:
Gromane Limited
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
An amendment planning application for a planning application granted under reference PL/21/1620 in the townlands of Coolnashinnagh, Ardragh, Gortfee and Bolakeale, Co Tipperary. The previously consented planning application comprised the installation of 2.25 km of a 38kV underground grid connection comprising cable ducting and associated electrical cabling and all other ancillary works including joint bays, culverts, maker posts and all associated development. The proposed amendments to the previously consented grid connection comprise:
• Increase in number of joint bays along the extent of the grid connection from a total of 35 to 45 joint bays
• Grid connection to be operated at 38kV but installed to a 110kV underground cable design standards/infrastructure
• Minor Adjustments to the route and red line boundary
Advisory Note: The full extent of the grid connection is 33.65 km, and a separate amendment planning application will be made for an underground grid connection to Kilkenny County Council.
Development Address:
Various townlands - Coolanshinnagh, Ardragh, Gortfree, Bolakeale, Co Tipperary.
Various townlands - Coolanshinnagh, Ardragh, Gortfree, Bolakeale Coolanshinnagh, Ardragh, Gortfree, Bolakeale Co Tipperary.
proposed amendments to the previously consented grid connection granted under pl. ref. 21/1620 to comprise of: a) increase in number of joint bays along the extent of the grid connection from a total of 35 to 45 joint bays, b) grid connection to be operated at 38kV but installed to a 110kV underground cable design standards/infrastructure, c) minor adjustments to the route and red line boundary (Advisory Note: The full extent of the grid connection is 33.65 km and a separate amendment planning application will be made for an underground grid connection to Kilkenny County Council)
an amendment to the planning application previously granted permission under planning reference 20/972. The previously consented planning application included the construction of 9 turbines with maximum overall ground to blade tip height of up to 150 metres, associated foundations and hardstand areas; new site entrances, upgrade of existing site entrances; new on-site 38KV substation and all ancillary site works. The proposed amendments to the previously consented application comprise: (1) Increase the tip height of the turbines from 150 to 156.5 metres and increase the rotor diameter from 133 to 136 metres (3) Reconfiguration of a number of the consented hardstand layouts and associated changes to internal access roads (4)
Minor Adjustments to the red line boundary (5) Provision of LiDAR (This application is accompanied by a NIS)