Planning application details ref: 2360402 Tipperary County Council

100%100% Complete (warning)

Planning Application: 2360402 (Tipperary County Council )
File Number: 2360402
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 14/06/2023 Decision Due Date: 08/08/2023
Validated Date: 14/06/2023 Invalidated Date:
Further Info Requested: Further Info Received:
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 03/08/2023
Leave to Appeal: Appeal Date: 11/08/2023
Commenced Date: Submissions By: 18/07/2023

Applicant Details

Applicant name: Gromane Limited
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: proposed amendments to the previously consented grid connection granted under pl. ref. 21/1620 to comprise of: a) increase in number of joint bays along the extent of the grid connection from a total of 35 to 45 joint bays, b) grid connection to be operated at 38kV but installed to a 110kV underground cable design standards/infrastructure, c) minor adjustments to the route and red line boundary (Advisory Note: The full extent of the grid connection is 33.65 km and a separate amendment planning application will be made for an underground grid connection to Kilkenny County Council)
Development Address: Various townlands - Coolanshinnagh, Ardragh, Gortfree, Bolakeale, Coolanshinnagh, Ardragh, Gortfree, Bolakeale, Co Tipperary.
Architect Name: Location Key: COOLASHINNAGH, ARDRAGH ETC
Electoral Division: Planner: Paul Killeen
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 03/08/2023 Manager Order:
Decision Type: Conditional Number of Conditions: 2
Grant Date: Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date: 10/11/2029
Decision Description: proposed amendments to the previously consented grid connection granted under pl. ref. 21/1620 to comprise of: a) increase in number of joint bays along the extent of the grid connection from a total of 35 to 45 joint bays, b) grid connection to be operated at 38kV but installed to a 110kV underground cable design standards/infrastructure, c) minor adjustments to the route and red line boundary (Advisory Note: The full extent of the grid connection is 33.65 km and a separate amendment planning application will be made for an underground grid connection to Kilkenny County Council)

Appeal Details


Appeal Details
Notification Date: 14/08/2023 BP Reference #: ABP-317772-23
Appeal Type: THIRD PARTY File Forward Date: 16/08/2023
Submission Due Date: 10/09/2023 Submission Sent Date: 06/09/2023
Appeal Decision: CONDITIONAL Decision Date: 11/11/2024
Withdrawn Date: Dismissed Date:
Reason: