File Number: | 19175 | ||
Application Type: | EXTENTION OF DURATION | Planning Status: | APPLICATION FINALISED |
Received Date: | 14/06/2019 | Decision Due Date: | 08/08/2019 |
Validated Date: | 14/06/2019 | Invalidated Date: | |
Further Info Requested: | Further Info Received: | ||
Withdrawn Date: | Extend Date: | ||
Decision Type: | Decision Date: | 07/08/2019 | |
Leave to Appeal: | Appeal Date: | ||
Commenced Date: | Submissions By: |
Applicant Details |
|||
---|---|---|---|
Applicant name: | Iarnrod Eireann | ||
Applicant Address: | |||
Phone Number: | Fax Number: | ||
Corresp. Address: |
Proposed Development |
|||
---|---|---|---|
Development Description: | E.O.D on 14/18: Permission for development at (a protected structure). Northern Elevation: The construction of a new 95 square metres single storey fully accessible glazed entrance building, the extension of the existing North Eastern bay platform, new 2m high boundary treatment to enclose this platform extension. Demolition of the existing lean too single storey building at the North eastern end of station, internal alterations and removal of walls within the train station to provide additional ticket purchase facilities, enlarged concourse areas, new toilet facilities, new ticket inspector accommodation North Eastern side of the station. The removal of the existing steel ramped access to the main station entrance after completion of the level access pedestrian entrances to the southern elevation. The reinstatement of the original step arrangement to the station building. Southern Elevation; CIE Stores and Maintenance Area (a protected structure). The refurbishment of the existing stores and maintenance area to provide 2336 square metres of extended train concourse and platform, new pedestrian entrances, new curved partially glazed roof single span structure to replace existing roof, new openings within the existing South Western facade of the building to create new glazed entrances and fenestration. The proposed construction of new sloped approach routes, entrance plazas, street lighting and furniture, new glazed canopies to entrance plazas. New glazed entrances and fenestration to existing openings to South West, South East and North West elevations. The construction of new glazed retail pods and new toilet block within the station. New glazed doors and screens to be created to existing arches to both North Western and South eastern elevations of building. The removal of the existing internal mezzanine floor, removal of the existing ramped access, demolition of the existing lean to buildings at the North Western side of the building, demolition of the shed to the South Eastern gable of the building. Site works to include, inter alia, demolition of existing single storey industrial storage building and associated fuel silos to existing car park, reinstatement of car park paving, provision of 5no. disabled car parking spaces, new footpaths to both South Western elevations of station, removal of existing footpath to South Western gable of Meyrick Hotel and the construction of a new pedestrian walkway from the South East corner of Eyre Square to the etc.... | ||
Development Address: | Ceannt Station, Station Road, Galway | ||
Architect Name: | Location Key: | STATION ROAD | |
Electoral Division: | Planner: | Liam Blake | |
Social Housing Exempt: | Plan Enforcement #: | ||
IPC Licence Required: | No | Waste Licence Required: | No |
Protected Structure: | No | Protected Structure #: | |
Development Name: |
Comments |
|||
---|---|---|---|
Significant Case Flag: | Comments: | EOD |
Decision |
|||
---|---|---|---|
Decision Date: | 07/08/2019 | Manager Order: | 70736 |
Decision Type: | Number of Conditions: | 0 | |
Grant Date: | Grant Managers Order #: | ||
Section 47 Apply?: | Part 5 Apply?: | ||
Expiry Date: | 06/08/2020 | ||
Decision Description: | E.O.D on 14/18: Permission for development at (a protected structure). Northern Elevation: The construction of a new 95 square metres single storey fully accessible glazed entrance building, the extension of the existing North Eastern bay platform, new 2m high boundary treatment to enclose this platform extension. Demolition of the existing lean too single storey building at the North eastern end of station, internal alterations and removal of walls within the train station to provide additional ticket purchase facilities, enlarged concourse areas, new toilet facilities, new ticket inspector accommodation North Eastern side of the station. The removal of the existing steel ramped access to the main station entrance after completion of the level access pedestrian entrances to the southern elevation. The reinstatement of the original step arrangement to the station building. Southern Elevation; CIE Stores and Maintenance Area (a protected structure). The refurbishment of the existing stores and maintenance area to provide 2336 square metres of extended train concourse and platform, new pedestrian entrances, new curved partially glazed roof single span structure to replace existing roof, new openings within the existing South Western facade of the building to create new glazed entrances and fenestration. The proposed construction of new sloped approach routes, entrance plazas, street lighting and furniture, new glazed canopies to entrance plazas. New glazed entrances and fenestration to existing openings to South West, South East and North West elevations. The construction of new glazed retail pods and new toilet block within the station. New glazed doors and screens to be created to existing arches to both North Western and South eastern elevations of building. The removal of the existing internal mezzanine floor, removal of the existing ramped access, demolition of the existing lean to buildings at the North Western side of the building, demolition of the shed to the South Eastern gable of the building. Site works to include, inter alia, demolition of existing single storey industrial storage building and associated fuel silos to existing car park, reinstatement of car park paving, provision of 5no. disabled car parking spaces, new footpaths to both South Western elevations of station, removal of existing footpath to South Western gable of Meyrick Hotel and the construction of a new pedestrian walkway from the South East corner of Eyre Square to the etc.... |
Appeal Details | |||
---|---|---|---|
Notification Date: | BP Reference #: | ||
Appeal Type: | File Forward Date: | ||
Submission Due Date: | Submission Sent Date: | ||
Appeal Decision: | Decision Date: | ||
Withdrawn Date: | Dismissed Date: | ||
Reason: |