File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
1045 |
APPLICATION FINALISED |
PERMISSION |
C |
01/03/2010 Monday |
Gerard Barrett |
Hotel Meyrick Eyre Square Galway |
Permission for development of a protected structure. The development will consist of the demolition of the modern concrete wing to the rear of the hotel including the integral modern escape stair and the construction of a new escape stair in its place |
1418 |
APPLICATION FINALISED |
PERMISSION |
C |
30/01/2014 Thursday |
Iarnród Éireann, Structures & Architects Dept. |
Céannt Station Station Road Galway |
Permission for development at (a protected structure). Northern Elevation: The construction of a new 95 square metres single storey fully accessible glazed entrance building, the extension of the existing North Eastern bay platform, new 2m high boundary treatment to enclose this platform extension. Demolition of the existing lean too single storey building at the North eastern end of station, internal alterations and removal of walls within the train station to provide additional ticket purchase facilities, enlarged concourse areas, new toilet facilities, new ticket inspector accommodation North Eastern side of the station. The removal of the existing steel ramped access to the main station entrance after completion of the level access pedestrian entrances to the southern elevation. The reinstatement of the original step arrangement to the station building. Southern Elevation; CIE Stores and Maintenance Area (a protected structure). The refurbishment of the existing stores and maintenance area to provide 2336 square metres of extended train concourse and platform, new pedestrian entrances, new curved partially glazed roof single span structure to replace existing roof, new openings within the existing South Western facade of the building to create new glazed entrances and fenestration. The proposed construction of new sloped approach routes, entrance plazas, street lighting and furniture, new glazed canopies to entrance plazas. New glazed entrances and fenestration to existing openings to South West, South East and North West elevations. The construction of new glazed retail pods and new toilet block within the station. New glazed doors and screens to be created to existing arches to both North Western and South eastern elevations of building. The removal of the existing internal mezzanine floor, removal of the existing ramped access, demolition of the existing lean to buildings at the North Western side of the building, demolition of the shed to the South Eastern gable of the building. Site works to include, inter alia, demolition of existing single storey industrial storage building and associated fuel silos to existing car park, reinstatement of car park paving, provision of 5no. disabled car parking spaces, new footpaths to both South Western elevations of station, removal of existing footpath to South Western gable of Meyrick Hotel and the construction of a new pedestrian walkway from the South East corner of Eyre Square to the new etc.... |
19175 |
APPLICATION FINALISED |
EXTENTION OF DURATION |
U |
14/06/2019 Friday |
Iarnrod Eireann |
Ceannt Station Station Road Galway |
E.O.D on 14/18: Permission for development at (a protected structure). Northern Elevation: The construction of a new 95 square metres single storey fully accessible glazed entrance building, the extension of the existing North Eastern bay platform, new 2m high boundary treatment to enclose this platform extension. Demolition of the existing lean too single storey building at the North eastern end of station, internal alterations and removal of walls within the train station to provide additional ticket purchase facilities, enlarged concourse areas, new toilet facilities, new ticket inspector accommodation North Eastern side of the station. The removal of the existing steel ramped access to the main station entrance after completion of the level access pedestrian entrances to the southern elevation. The reinstatement of the original step arrangement to the station building. Southern Elevation; CIE Stores and Maintenance Area (a protected structure). The refurbishment of the existing stores and maintenance area to provide 2336 square metres of extended train concourse and platform, new pedestrian entrances, new curved partially glazed roof single span structure to replace existing roof, new openings within the existing South Western facade of the building to create new glazed entrances and fenestration. The proposed construction of new sloped approach routes, entrance plazas, street lighting and furniture, new glazed canopies to entrance plazas. New glazed entrances and fenestration to existing openings to South West, South East and North West elevations. The construction of new glazed retail pods and new toilet block within the station. New glazed doors and screens to be created to existing arches to both North Western and South eastern elevations of building. The removal of the existing internal mezzanine floor, removal of the existing ramped access, demolition of the existing lean to buildings at the North Western side of the building, demolition of the shed to the South Eastern gable of the building. Site works to include, inter alia, demolition of existing single storey industrial storage building and associated fuel silos to existing car park, reinstatement of car park paving, provision of 5no. disabled car parking spaces, new footpaths to both South Western elevations of station, removal of existing footpath to South Western gable of Meyrick Hotel and the construction of a new pedestrian walkway from the South East corner of Eyre Square to the etc.... |