File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
0428 |
APPLICATION FINALISED |
PERMISSION |
C |
19/01/2004 Monday |
Kevin & Martina Rice |
15 The Baily, Circular Ro ad, Dangan Upper, Galway
|
Permission for an extension to the rear of dwellinghouse |
11146 |
APPLICATION FINALISED |
RETENTION |
C |
02/06/2011 Thursday |
Iarnród Eireann |
Ceannt Railway Station Galway |
Permission for retention for development which consists of work within the curtilage of Ceannt Railway Station, a protected structure (RPSI 10001). The development consists of a new mobility impaired accessibility ramp and footsteps providing access to the rear of Ceannt Station, including the installation of two 5m high lighting columns |
1418 |
APPLICATION FINALISED |
PERMISSION |
C |
30/01/2014 Thursday |
Iarnród Éireann, Structures & Architects Dept. |
Céannt Station Station Road Galway |
Permission for development at (a protected structure). Northern Elevation: The construction of a new 95 square metres single storey fully accessible glazed entrance building, the extension of the existing North Eastern bay platform, new 2m high boundary treatment to enclose this platform extension. Demolition of the existing lean too single storey building at the North eastern end of station, internal alterations and removal of walls within the train station to provide additional ticket purchase facilities, enlarged concourse areas, new toilet facilities, new ticket inspector accommodation North Eastern side of the station. The removal of the existing steel ramped access to the main station entrance after completion of the level access pedestrian entrances to the southern elevation. The reinstatement of the original step arrangement to the station building. Southern Elevation; CIE Stores and Maintenance Area (a protected structure). The refurbishment of the existing stores and maintenance area to provide 2336 square metres of extended train concourse and platform, new pedestrian entrances, new curved partially glazed roof single span structure to replace existing roof, new openings within the existing South Western facade of the building to create new glazed entrances and fenestration. The proposed construction of new sloped approach routes, entrance plazas, street lighting and furniture, new glazed canopies to entrance plazas. New glazed entrances and fenestration to existing openings to South West, South East and North West elevations. The construction of new glazed retail pods and new toilet block within the station. New glazed doors and screens to be created to existing arches to both North Western and South eastern elevations of building. The removal of the existing internal mezzanine floor, removal of the existing ramped access, demolition of the existing lean to buildings at the North Western side of the building, demolition of the shed to the South Eastern gable of the building. Site works to include, inter alia, demolition of existing single storey industrial storage building and associated fuel silos to existing car park, reinstatement of car park paving, provision of 5no. disabled car parking spaces, new footpaths to both South Western elevations of station, removal of existing footpath to South Western gable of Meyrick Hotel and the construction of a new pedestrian walkway from the South East corner of Eyre Square to the new etc.... |
1623 |
APPLICATION FINALISED |
PERMISSION |
R |
01/02/2016 Monday |
Megdo Ltd. |
Ceannt Station Station Road Galway |
Permission to erect an illuminated projecting sign on the front (North east) elevation. Ceannt Station is listed on the Record of Protected Structures Ref: 10001 |
16221 |
APPLICATION FINALISED |
PERMISSION |
R |
29/07/2016 Friday |
MEGDO Ltd |
Ceannt Station Station Road Galway |
Permission to erect a projecting sign on the front (North East) elevation. This is listed on the Record of Protected Structures Ref: 10001 |
19175 |
APPLICATION FINALISED |
EXTENTION OF DURATION |
U |
14/06/2019 Friday |
Iarnrod Eireann |
Ceannt Station Station Road Galway |
E.O.D on 14/18: Permission for development at (a protected structure). Northern Elevation: The construction of a new 95 square metres single storey fully accessible glazed entrance building, the extension of the existing North Eastern bay platform, new 2m high boundary treatment to enclose this platform extension. Demolition of the existing lean too single storey building at the North eastern end of station, internal alterations and removal of walls within the train station to provide additional ticket purchase facilities, enlarged concourse areas, new toilet facilities, new ticket inspector accommodation North Eastern side of the station. The removal of the existing steel ramped access to the main station entrance after completion of the level access pedestrian entrances to the southern elevation. The reinstatement of the original step arrangement to the station building. Southern Elevation; CIE Stores and Maintenance Area (a protected structure). The refurbishment of the existing stores and maintenance area to provide 2336 square metres of extended train concourse and platform, new pedestrian entrances, new curved partially glazed roof single span structure to replace existing roof, new openings within the existing South Western facade of the building to create new glazed entrances and fenestration. The proposed construction of new sloped approach routes, entrance plazas, street lighting and furniture, new glazed canopies to entrance plazas. New glazed entrances and fenestration to existing openings to South West, South East and North West elevations. The construction of new glazed retail pods and new toilet block within the station. New glazed doors and screens to be created to existing arches to both North Western and South eastern elevations of building. The removal of the existing internal mezzanine floor, removal of the existing ramped access, demolition of the existing lean to buildings at the North Western side of the building, demolition of the shed to the South Eastern gable of the building. Site works to include, inter alia, demolition of existing single storey industrial storage building and associated fuel silos to existing car park, reinstatement of car park paving, provision of 5no. disabled car parking spaces, new footpaths to both South Western elevations of station, removal of existing footpath to South Western gable of Meyrick Hotel and the construction of a new pedestrian walkway from the South East corner of Eyre Square to the etc.... |
2047 |
APPLICATION FINALISED |
PERMISSION |
C |
26/02/2020 Wednesday |
Seagullpoint Limited |
Lands to the rear of Ceannt Train Station Station Road Galway City |
Large scale development, details of which are laid out in Planning Application Details online and site notice |
21278 |
APPLICATION FINALISED |
PERMISSION |
C |
27/08/2021 Friday |
Iarnród Éireann |
Ceannt Train Station Station Road Galway |
Permission for the development at Former Engine Shed (Protected Structure RPS N0. 10002) which will consist of 1. removal of the existing metal roofing and asbestos roof covering to the existing structure 2. partial demolition of the front entrance wall to the southwest of the building to allow for a new recessed entrance to facilitate accessible access to this development and the adjacent development adjoined to the south (ref: 19347). 3. Other works to the existing fabric which will include the removal of masonry to openings currently blocked up, replacement of the roof finishes, windows and floors and insulation of the structure as necessary. 4. Localised openings within the building as necessary to facilitate safe and accessible use of the building. Proposed use of the building is to be welfare and administration facilities for station staff. Existing building is listed on the record of protected structures (10002). |
2287 |
APPLICATION FINALISED |
PERMISSION |
C |
13/04/2022 Wednesday |
Iarnrod Eireann |
Ceannt Railway Station Station Road Galway City |
Permission for development which will consist of changes to previously approved planning permission ref no. 14/18 (extended under 19/175). Ceannt Railway Station is a protected structure (RPS 10001). The changes include: 1. Partial removal of three no. internal walls in the northern buildings to increase visibility and thus assist with both passenger flow and wayfinding and accessibility. 2. The partial removal of some of the existing concrete floor on the eastern side of the station building and the subsequent lowering of same by approx. 180 mm to be at the same level throughout and thus assist with passenger accessibility |
22167 |
APPLICATION FINALISED |
PERMISSION |
C |
14/06/2022 Tuesday |
Sean McCallion - Iarnrod Eireann |
Ceannt Railway Station Station Road Galway |
Permission for development which will consist of a stand alone waste compactor building at Ceannt Railway Station, Station Road, Galway, H91 T9CE. Ceannt Station is a protected building (RPS 10001). |
2442 |
INVALID APPLICATION |
PERMISSION |
|
08/08/2024 Thursday |
Sean McCallion Iarnrod Eireann |
Ceannt Railway Station Station Road Galway |
Permission for development which consists of; permission for changes to an already approved application ref no. 14/18 at Ceannt Railway Station, Station Road Galway. The proposed changes are to increase the size of the new public toilet facilities. Ceannt Railway Station is a protected structure (RPS 10001) |
FS1722 |
DECISION MADE |
APPROVAL |
U |
23/02/2022 Wednesday |
Paul O'Farrell |
Ceannt Station Station Road Galway |
New entrance building to the Fish Gate and internal alterations to facilitate level access to new ticket office facilities. Extended train concourse and platforms, new glazed roof and new entrances opened up from the south. |