17902 |
APPLICATION FINALISED |
PERMISSION |
R |
12/09/2017 Tuesday |
THE BALLYLONGFORD WINDFARM GROUP |
AGHANAGRAN MIDDLE, AGHANAGRAN LOWER, BALLYLINE WEST AND TULLAHENNELL SOUTH BALLYLONGFORD |
CONSTRUCT A WINDFARM CONSISTING OF 8 WIND TURBINES WITH AN OVERALL GROUND TO BLADE TIP HEIGHT OF UP TO 126.5 METERS. THE DEVELOPMENT WILL ALSO INCLUDE BATTERY UNITS, UPGRADING OF EXISTING ACCESS TRACKS AND THE PROVISION OF NEW INTERNAL ACCESS ROADS, THE DEVELOPMENT AND IMPROVEMENT OF EXISTING ENTRANCES ONTO THE PUBLIC ROAD NETWORK, THE PROVISION OF A WIND ANEMOMETRY MAST (HEIGHT UP TO 80 METERS), 1 NO. PEAT DEPOSITION AREA, UNDERGROUND ELECTRICITY CABLES / CABLING, 2 ELECTRICITY SUBSTATIONS WITH CONTROL ROOM AND ASSOCIATED EQUIPMENT, TEMPORARY CONSTRUCTION COMPOUND AND ALL ANCILLARY SITE AND GROUND WORKS. THE DEVELOPMENT WILL ALSO CONSIST OF THE CONNECTION OF THE PROPOSED DEVELOPMENT, VIA UNDERGROUND ELECTRICITY CABLES, TO THE EXISTING ESB SUBSTATION AT KILPADDOGE, TARBERT. THE UNDERGROUND CABLE WILL BE LOCATED IN THE TOWNLANDS OF: AGHANAGRAN LOWER, BALLYLINE WEST, BALLYMACASY, LISLAUGHTIN, GLANCULLARE SOUTH, GURTEENAVALLIG, MEELCON, CARHOONA, FARRANAWANA, DOONARD UPPER, DOONARD LOWER, TARBERT AND KILPADDOGE, CO KERRY. THE APPLICANTS IS SEEKING A TEN YEAR PLANNING PERMISSION AND OPERATIONAL PERIOD OF 25 YEARS. THE APPLICATION IS ACCOMPANIED BY AN EIS / EIAR |
20438 |
APPLICATION FINALISED |
PERMISSION |
R |
15/05/2020 Friday |
THE BALLYLONGFORD WINDFARM GROUP |
MEELCON, CARHOONA, FARRANAWANA, TARBERT,DOONARD UPPER AND LOWER, KILPADDOGE, BALLYLINE WEST, BALLYMACASY, LISLAUGHTIN, GLAMCULLARE SOUTH, GURTEENAVALLIG CO KERRY |
AMEND A PREVIOUSLY GRANTED PERMISSION (KERRY COUNTY COUNCIL PLANNING REF 19/381) ( AN BORD PLEANALA REF ABP- 304807-19) WHICH RELATES TO A CHANGE IN THE GRID CONNECTION ROUTE FOR THE PERMITTED WIND FARM. THE REVISED ROUTE WILL ENTAIL THE CONSTRUCTION OF APPROXIMATELY 12.1KM OF 38KV UNDERGROUND ELECTRIC CABLE CONNECTING THE EXISTING PERMITTED WINDFARM (19/381) TO THE 38Kva/110Kva SUBSTATION AT KILPADDOGE, TARBERT. THE UNDERGROUND CABLES WILL BE LOCATED ALONG THE PUBLIC ROADS R551, R552 AND L-1010 AND ALONG 2 SECTIONS OF PRIVATE PROPERTY. THE CABLE WILL BE INSTALLED IN EXCAVATED TRENCHES APPROXIMATELY 1.2M IN DEPTH AND WILL INCLUDE ASSOCIATED UNDERGROUND DUCTING JOINT BAYS, COMMUNICATION CHAMBER BAYS, DRILL PITS, SHEATH LINK BOXES AND INSPECTION CHAMBERS, ASSOCIATED EQUIPMENT AND ALL ANCILLARY SITE AND GROUND WORKS. THE DEVELOPMENT WILL ALSO CONSIST OF THE CONNECTION OF THE PERMITTED WINDFARM (19/381), VIA EXISTING PERMITTED UNDERGROUND ELECTRICITY CABLES, TO THE PROPOSED CABLE.THE UNDERGROUND CABLE WILL BE LOCATED IN THE TOWNLANDS OF BALLYLINE WEST, BALLYMACASY, LISLAUGHTIN, GLANCULLARE SOUTH, GURTEENAVALLIG,MEELCON CARHOONA, FARRANAWANA, DOONARD UPPER, DOONARD LOWER TARBERT AND KILPADDOGE ' THE APPLICANT IS SEEKING A TEN YEAR PLANNING PERMISSION AND OPERATIONAL PERIOD OF 25 YEARS. AN APPROPRIATE ASSESSMENT SCREENING REPORT AND AN ENVIRONMENTAL IMPACT ASSESSMENT SCREENING REPORT HAS BE PREPARED AND SUBMITTED AS PART OF THIS APPLICATION. AN NIS HAS BEEN SUBMITTED WITH THIS APPLICATION |