File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
06510829 |
APPLICATION FINALISED |
PERMISSION |
C |
23/06/2006 Friday |
Kevin & Noreen Ryan |
Monakeeba Mill Rd Thurles |
to retain fuel & storage shed (original permission PLC/16267) and a waste oil collection tank; modifications to the fuel and storage shed to include additional floor area of 145 sqm, ancillary office 21.7 sqm and a toilet facility. Permission is sought for connection to the existing county council foul rising main to the front of the site and for a gas storage compound to west (rear) of the existing building |
10510108 |
APPLICATION FINALISED |
PERMISSION |
R |
19/03/2010 Friday |
Ryan Brothers Environmental Services |
Monakeeba Mill Road Thurles |
new waste recovery/recycling facility building, plus an on site package sewage treatment plant, polishing filter & pipe work to cater for the existing & proposed developments, plus associated works which would include a surface water collection system with rainwater harvesting, oil & silt interceptor & attenuation measures, de-commissioning of existing septic tank & percolation area, car parking, noise attenuation barriers, security & stock proof fencing & gates, kerbing & paving, alterations to site entrance, together with a partial change of use of existing building office & office wc (31.1m2 approximately) to shared use as office & office wc between the existing & proposed developments. The waste recovery/recycling facility building would take in dry recyclables & skip hire materials & would also include an enclosed parking & refuelling area for a waste collection truck fleet. The building would have a gross floor area of 1,099.62 m2 approximately & would be 10.50m in height. A waste facility permit would be required in relation to the development |
11510450 |
APPLICATION FINALISED |
PERMISSION |
C |
22/12/2011 Thursday |
Ryan Brothers Environmental Services |
Monakeeba Mill Road Thurles |
new waste recovery/recycling facility building, plus an on site package sewage treatment plant, polishing filter & pipe work to cater for the existing & proposed developments, plus associated works which would include a surface water collection system with rainwater harvesting, oil & silt interceptor & attenuation measures, de-commissioning of existing septic tank & percolation area, car parking, noise attenuation barriers, security & stock proof fencing & gates, kerbing & paving, alterations to site entrance, together with a partial change of use of existing building office & office w.c. (31.1m2 approximately) to shared use as office & office w.c. between the existing & proposed developments. The waste recovery/recycling facility building would take in dry recyclables & skip hire materials & would also include an enclosed parking & refuelling area for a waste collection truck fleet. The building would have a gross floor area of 1,099.62 m2 approximately & would be 10.50m in height. A waste facility permit would be required in relation to the development |
15601055 |
APPLICATION FINALISED |
PERMISSION |
C |
11/12/2015 Friday |
Ryan Brothers Environmental Services |
Monakeeba Mill Road Thurles |
1) Construction of a new waste management facility building (c. 12
m height, c. 971 m2 gross floor area)
2) Construction of a new on-site waste water treatment plant
(packaged secondary system plus packaged tertiary system) &
associated pipework to cater for the existing & proposed
developments
3) Associated & ancillary works will include new surface water
collection system with rainwater harvesting, attenuation measures,
de-commissioning of existing septic tank & percolation area, vehicle
parking, staff parking, fuelling facilities, noise attenuation barriers,
security & stock proof fencing & gates, kerbing, internal footpaths,
road side footpaths & street lighting, structural fill & paving, slabs,
alterations to site entrance, and landscaping
4) Retention of partial change of use of pre-existing authorised
building office & office w.c. (c. 35 m2) to shared use as office &
office w.c. between the pre-existing & proposed developments, and
retention of change of use of pre-existing authorised slab for use as a
slab in the proposed development (c. 261 m2)
5) Retention of the current layout and uses of conveyance plant
including intake enclosure & ramps which will all be enclosed by the
new facility building
6) Retention of inert fill to low lying areas of site (c. 532 m3). The
retention fill area will be finished to profiles with soft landscaping
including trees, shrubbery, & grasses, and will be used to enclose a
new attenuation structure and as part of a landscaped site buffer /
floodplain
7) Retention of associated & ancillary works and current uses
including weighbridge, wheelwash, relocated hydrocarbon
interceptor, silt trap, & pipework, and slabs (c. 593 m2)
The facility will recover inert waste arising from construction &
demolition activity including concrete, bricks, tiles, or other such
similar material. The facility will recover, store, & transfer dry
recyclables and will receive, store, & transfer waste (other than
hazardous waste) for onward disposal. The new facility building will
enclose the retained conveyance plant and other industrial equipment
and will include a vehicle refuelling area. The conveyance plant will
be used to convey waste from collection vehicles to larger transport
vehicles. A waste facility permit would be required in relation to the
development |
2460077 |
APPLICATION FINALISED |
PERMISSION FOR RETENTION |
C |
07/02/2024 Wednesday |
Pride Point Unlimited Co. T/A Ryan Brothers Environmental Services |
Mill Road, Thurles Co. Tipperary E41 YR79 |
1) the empty wheelie bin storage area and permission for construction of new canopy to enclose same, 2) the current layout and uses of the storage area for open recyclables bins, empty skips, and empty trailers, 3) the flood lighting and CCTV cameras to the east, west, and north facades of the existing buildings, 4) the current operational processes used at the facility building from those previously authorised, 5) the as-built odour control unit and permission for a revised stack height of 14 m, 6) the as-installed weighbridge container office, 7) the as-built site access, 8) the as-built facility yard, 9) the relocated as-built wash-down area, 10) the as-built lower area to the west of site (including attenuation tank, screening mounds, and existing ground levels & profiles). Planning Permission for the amendment to Condition 13 of current planning permission, and all associated and ancillary works |