03510990 |
APPLICATION FINALISED |
PERMISSION FOR RETENTION |
C |
17/09/2003 Wednesday |
Kevin and Paul Ryan |
Monakeeba Mill Road Thurles |
Retention of building measuring 450 sq. m. and for its use for fuel storage and baling and storage of pre-segregated cardboard, retention of gas storage compound measuring 118 sq. m., hardstanding area measuring 7,527 sq. m. and concrete loading area measuring 191 sq. m., retention of connection to permitted septic tank and percolation area, and permission for storage of new bins for distribution to households, 4 no. skips for storage of glass collected by applicant, parking for 2 no. fuel lorries, 2 no. oil lorries and 4 no. waste collection lorries and all associated site development works |
06510829 |
APPLICATION FINALISED |
PERMISSION |
C |
23/06/2006 Friday |
Kevin & Noreen Ryan |
Monakeeba Mill Rd Thurles |
to retain fuel & storage shed (original permission PLC/16267) and a waste oil collection tank; modifications to the fuel and storage shed to include additional floor area of 145 sqm, ancillary office 21.7 sqm and a toilet facility. Permission is sought for connection to the existing county council foul rising main to the front of the site and for a gas storage compound to west (rear) of the existing building |
10510108 |
APPLICATION FINALISED |
PERMISSION |
R |
19/03/2010 Friday |
Ryan Brothers Environmental Services |
Monakeeba Mill Road Thurles |
new waste recovery/recycling facility building, plus an on site package sewage treatment plant, polishing filter & pipe work to cater for the existing & proposed developments, plus associated works which would include a surface water collection system with rainwater harvesting, oil & silt interceptor & attenuation measures, de-commissioning of existing septic tank & percolation area, car parking, noise attenuation barriers, security & stock proof fencing & gates, kerbing & paving, alterations to site entrance, together with a partial change of use of existing building office & office wc (31.1m2 approximately) to shared use as office & office wc between the existing & proposed developments. The waste recovery/recycling facility building would take in dry recyclables & skip hire materials & would also include an enclosed parking & refuelling area for a waste collection truck fleet. The building would have a gross floor area of 1,099.62 m2 approximately & would be 10.50m in height. A waste facility permit would be required in relation to the development |
11510450 |
APPLICATION FINALISED |
PERMISSION |
C |
22/12/2011 Thursday |
Ryan Brothers Environmental Services |
Monakeeba Mill Road Thurles |
new waste recovery/recycling facility building, plus an on site package sewage treatment plant, polishing filter & pipe work to cater for the existing & proposed developments, plus associated works which would include a surface water collection system with rainwater harvesting, oil & silt interceptor & attenuation measures, de-commissioning of existing septic tank & percolation area, car parking, noise attenuation barriers, security & stock proof fencing & gates, kerbing & paving, alterations to site entrance, together with a partial change of use of existing building office & office w.c. (31.1m2 approximately) to shared use as office & office w.c. between the existing & proposed developments. The waste recovery/recycling facility building would take in dry recyclables & skip hire materials & would also include an enclosed parking & refuelling area for a waste collection truck fleet. The building would have a gross floor area of 1,099.62 m2 approximately & would be 10.50m in height. A waste facility permit would be required in relation to the development |
15601055 |
APPLICATION FINALISED |
PERMISSION |
C |
11/12/2015 Friday |
Ryan Brothers Environmental Services |
Monakeeba Mill Road Thurles |
1) Construction of a new waste management facility building (c. 12
m height, c. 971 m2 gross floor area)
2) Construction of a new on-site waste water treatment plant
(packaged secondary system plus packaged tertiary system) &
associated pipework to cater for the existing & proposed
developments
3) Associated & ancillary works will include new surface water
collection system with rainwater harvesting, attenuation measures,
de-commissioning of existing septic tank & percolation area, vehicle
parking, staff parking, fuelling facilities, noise attenuation barriers,
security & stock proof fencing & gates, kerbing, internal footpaths,
road side footpaths & street lighting, structural fill & paving, slabs,
alterations to site entrance, and landscaping
4) Retention of partial change of use of pre-existing authorised
building office & office w.c. (c. 35 m2) to shared use as office &
office w.c. between the pre-existing & proposed developments, and
retention of change of use of pre-existing authorised slab for use as a
slab in the proposed development (c. 261 m2)
5) Retention of the current layout and uses of conveyance plant
including intake enclosure & ramps which will all be enclosed by the
new facility building
6) Retention of inert fill to low lying areas of site (c. 532 m3). The
retention fill area will be finished to profiles with soft landscaping
including trees, shrubbery, & grasses, and will be used to enclose a
new attenuation structure and as part of a landscaped site buffer /
floodplain
7) Retention of associated & ancillary works and current uses
including weighbridge, wheelwash, relocated hydrocarbon
interceptor, silt trap, & pipework, and slabs (c. 593 m2)
The facility will recover inert waste arising from construction &
demolition activity including concrete, bricks, tiles, or other such
similar material. The facility will recover, store, & transfer dry
recyclables and will receive, store, & transfer waste (other than
hazardous waste) for onward disposal. The new facility building will
enclose the retained conveyance plant and other industrial equipment
and will include a vehicle refuelling area. The conveyance plant will
be used to convey waste from collection vehicles to larger transport
vehicles. A waste facility permit would be required in relation to the
development |
2360502 |
WITHDRAWN |
PERMISSION |
|
10/07/2023 Monday |
Pride Point Unlimited Co. T/A Ryan Brothers Environmental Services |
Mill Road, Thurles Co. Tipperary in the townland of Monakeeba |
1) Upgrade, refurbishment, and alteration works to existing authorised office including: new internal layouts, new fire safety provisions including additional external doorways, new disability access provisions, ventilation, and new provisions for improved conservation of fuel and energy. 2) New single storey weighbridge building (c. 60 m2 gross floor area) to be located adjacent to existing authorised weighbridge, including: weighbridge office kiosk, canteen, welfare units including new accessible WC, & meeting room. The new building will be primarily required to facilitate systemic improvements to the recording of the waste types and quantities accepted into, and exported out of, the existing authorised facility. 3) New connection of proposed weighbridge building to existing on-site waste water treatment system (WWTS). 4) New solar photovoltaic (solar PV) renewable energy system including: solar panels mounted on existing facility building south facing roof leaf (c. 450 m2 of panel coverage), inverters, batteries, and all ancillary equipment and works. 5) Upgrade of acceptance limit of existing facility up to a maximum of 35,000 tonnes per annum of waste to reflect the available capacity of the newly as-built facility building, yard, and associated infrastructure completed under a previous planning permission. 6) Erection of canopy over existing authorised wash down bay (c. 72 m2). 7) Associated and ancillary works.
2 no. new structures / buildings: New single storey weighbridge building at c. 4.508 m high; and new canopy structure at 7.721 m high |