File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
09154 |
APPLICATION FINALISED |
PERMISSION |
C |
12/03/2009 Thursday |
SWS Energy |
Seskin Donohill Co Tipperary |
110/38kV electrical substation with compound of 110m x 90m dimensions, control building, 2 x 110kV end towers of 16.75m height, 3 x 38kV end towers of 12.5m height, 38kV and 110kV busbar, 2 x transformers, associated electrical infrastructure, palisade fencing, access road and proposed wastewater treatment system - an Environmental Report has been prepared as part of this application |
11270 |
APPLICATION FINALISED |
PERMISSION |
C |
24/06/2011 Friday |
ESB Wind Developments Ltd |
Cauteen Seskin Donohill |
Development consisting of alterations to the existing Cauteen 110kV station comprising of a new 110kV busbar including coupler bay, extension to the existing 110kV busbar, extension to the existing 38kV busbar, two new 110kV line bays, two new transformers and associated transformer bays, extension to the existing control building, existing entrance road and internal road to be extended, existing palisade compound to be extended and associated site works. |
12510385 |
APPLICATION FINALISED |
PERMISSION |
C |
13/11/2012 Tuesday |
ABO Wind Ireland Ltd., |
Knockcurraghbola Commons Knockcurraghbola Crownlands Graniera and Shevry |
wind energy project comprising of five wind turbines each with a maximum tip height of 126 metres. construction of new access tracks and the upgrading of existing tracks, an electrical substation, a borrow pit and associated works. The application is for a 10 year permission; an E.I.S. accompanies the application |
13510414 |
APPLICATION FINALISED |
PERMISSION |
C |
20/12/2013 Friday |
ABO Wind Ireland Ltd. |
Graniera Milestone Co. Tipperary |
ten year permission and the development will consist of a new entrance (on the R497 regional road) and associated works. This application is part of a separate planning application being made to South Tipperary County Council for a proposed wind energy project comprising two wind turbines (each with a maximum tip height of 126 metres), construction of new internal access roads, upgrading of existing internal access roads, underground cables and associated works in the townlands of Knockduff and Inchivara, South Tipperary. An Environmental Impact Statement and Natura Impact Statement accompany this application |
1410 |
APPLICATION FINALISED |
PERMISSION |
R |
10/01/2014 Friday |
ABO Wind Ireland Ltd |
Knockduff & Inchivara Milestone Co. Tipperary |
a ten year permission for development will comprise of a wind energy project of two wind turbines (each with a maximum tip height of 126 metres), construction of new internal access roads, upgrading of existing internal roads, underground cables and associated works. This application is part of a separate planning application being made to North Tipperary County Council for a proposed entrance at Graniera, Milestone, Co. Tipperary. An Environmental Impact Statement and Natura Impact Statement accompany this application |
15600566 |
APPLICATION FINALISED |
PERMISSION |
C |
10/07/2015 Friday |
ABO Wind Ireland Ltd |
Knockcurraghbola Commons Graniera, Shevry Co Tipperary |
for amendments & additions to an electrical substation associated with a previously permitted, 5 turbine wind farm development Ref No 12/51/0385. The electrical substation is situated in the townland of Graniera, Co Tipperary. Proposed amendments & additions include: a change from the permitted 20Kv to 38Kv electrical substation, changes to the electrical sub station control building including and increase in the area from approx 66m2 to approx 70m2, (building will measure approx 11.4m by 6.1m) Increase in max height from approx 4.6m to 5.95m & internal re-organisation of the layout the inclusion of adjoining switch gear compound ( approx 688m2 in area) enclosed by a pallisade security fence & vehicular access gates & construction of a crane hardstanding adjacent to compound, measuring approx 12m X 12m in area. The proposed development also includes for landscaping and all associated ancillary site development works above & below ground. An Environmental Impact Statement has been submitted. |
18601238 |
APPLICATION FINALISED |
PERMISSION |
C |
16/10/2018 Tuesday |
Coillte |
Gortmahonoge Hollyford Co. Tipperary |
the construction of a new entrance onto forestry land on the Southern side of the R497 public roadway. The new entrance from the public roadway will replace the existing substandard access to the land and this access will be permanently closed. The works will comprise the provision of splayed access, clear visibility sightlines, associated setting back of adjacent roadside boundaries, provision of associated surface water drainage, fences, finished hardcored structure to access area and all associated siteworks |
18601239 |
APPLICATION FINALISED |
PERMISSION |
C |
16/10/2018 Tuesday |
Coillte |
Gortmahonoge Hollyford Co. Tipperary |
the construction of a new entrance onto forestry land on the Northern side of the R497 public roadway. The new entrance from the public roadway will replace the existing substandard access to the land and this access will be permanently closed. The works will comprise the provision of splayed access, clear visibility sightlines, associated setting back of adjacent roadside boundaries, provision of associated surface water drainage, fences, finished hardcored structure to access area and all associated siteworks |